My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_City of Roslyn_PF Funding Award Agmt
>
Meetings
>
2022
>
08. August
>
2022-08-16 10:00 AM - Commissioners' Agenda
>
Resolution_City of Roslyn_PF Funding Award Agmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 12:03:07 PM
Creation date
8/11/2022 12:02:00 PM
Metadata
Fields
Template:
Meeting
Date
8/16/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution for an Amended 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
7
Placement
Consent Agenda
Row ID
92653
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Introduction <br />1.1. Project Purpose <br />The City of Roslyn (City) completed a Stormwater Comprehensive Plan (Plan) in July 2014. The <br />Plan contains structural and non-structural solutions to address stormwater conveyance and <br />water quality problems within the City. The Capital Improvement Plan (CIP) contained within the <br />Plan identifies various structural solutions to address conveyance issues by replacing pipes and <br />culverts. Nonstructural solutions such as stormwater management facility inspection, public <br />education and outreach, water quality monitoring and encouraging infiltration and low impact <br />development are aimed at improving water quality within the region. <br />The City received a Water Quality Grant from the Washington State Department of Ecology <br />(Ecology) to identify ways to improve water quality within the local waterway, Crystal Creek. The <br />goal is to identify Best Management Practices (BMPs) to provide stormwater runoff treatment for <br />Total Suspended Solids (TSS) and provide for reduction in other pollutants within the urbanized <br />areas of the City. <br />The grant has two objectives: <br />1. Evaluate the possible implementation of stormwater retrofits to provide water quality <br />treatment and determine the most suitable locations, methods, estimated costs, available <br />funding, and phased approach for such retrofits in a citywide study. <br />2. Advance design of stormwater treatment retrofit improvements for the CIP 1 project <br />which is a pipe rehabilitation project currently under design. <br />1.2. Report Purpose <br />This report documents the citywide study to be adopted as an addendum to City of Roslyn <br />Stormwater Comprehensive Plan. The CIP 1 treatment project will be advanced in detail design <br />after study completion. This addendum describes the drainage basin, details of the project site, <br />an analysis of the core elements, the alternatives considered, the design analysis, a quantification <br />of the water quality benefit, CIP summaries, financial review of potential funding, and operation <br />and maintenance considerations. <br />1.3. Design Codes and References <br />1.3.1. Department of Ecology <br />The analysis will be in accordance with Ecology's Stormwater Management Manual for Eastern <br />Washington (SWMMEW), 2019, and Ecology's Design Deliverables for Stormwater Projects with <br />Ecology Funding, June 2018. <br />1.3.2. City of Roslyn <br />This analysis will be in accordance with the City's Stormwater Regulations listed in Chapter 3 of <br />the Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.