My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_City of Roslyn_PF Funding Award Agmt
>
Meetings
>
2022
>
08. August
>
2022-08-16 10:00 AM - Commissioners' Agenda
>
Resolution_City of Roslyn_PF Funding Award Agmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 12:03:07 PM
Creation date
8/11/2022 12:02:00 PM
Metadata
Fields
Template:
Meeting
Date
8/16/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution for an Amended 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
7
Placement
Consent Agenda
Row ID
92653
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />I <br />Introductto, <br />1.1. Project Purpose...................................................................................................................1 <br />1.2. Report Purpose................................................................................................................... <br />t <br />1.3. Design Codes and References...........................................................................................1 <br />1.3.1. Department of Ecology.........................................................................................1 <br />1.3.2. City of Roslyn.......................................................................................................1 <br />2.1. General...............................................................................................................................2 <br />2.2. Historic and Existing Conditions.........................................................................................2 <br />2.3. Proposed Conditions...........................................................................................................2 <br />3 <br />Project Site Description _. <br />3 <br />3.1. Project Limits....................................................................................................................... <br />3 <br />3.2. Project Site Conditions........................................................................................................3 <br />3.3. Stormwater Features...........................................................................................................4 <br />4. <br />Core Elemei _ <br />4 <br />5. <br />Alternatives Considered.......__...... _.... ..._.._ <br />.. 4 <br />6 <br />Design in clysis <br />6.1. Existing Stormwater Drainage System ..... .... ........ ..—................. ...... <br />............. ....... .............. 6 <br />6.2. Proposed BMP Design and Improvements.........................................................................6 <br />7 <br />Water Quality Be- <br />7.1. Runoff Treatment Comparison............................................................................................ <br />8 <br />7.2. Equivalent New/Redevelopment Areas.............................................................................. <br />9 <br />8 <br />Capital Improvement Plan ._.__ <br />EXHIBITS <br />Exhibit 1 — Basin and Study Map <br />APPENDICES <br />Appendix A — Drainage Parameters <br />Appendix B — Existing Flow Rates <br />Appendix C — Swale Calculations <br />Appendix D — Equivalent New Redevelopment Areas for Biofiltration Swales Calculations Sheet <br />Appendix E — CIP 1 Cost Estimate <br />Appendix F — Operations and Maintenance Tables <br />
The URL can be used to link to this page
Your browser does not support the video tag.