My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-25-minutes-public-works-study-session
>
Meetings
>
2022
>
08. August
>
2022-08-02 10:00 AM - Commissioners' Agenda
>
2022-07-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 10:48:39 AM
Creation date
7/28/2022 12:11:48 PM
Metadata
Fields
Template:
Meeting
Date
8/2/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
Commissioners' Auditorium
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
5
Placement
Consent Agenda
Row ID
92041
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
curve. The construction drawings at the time identify the area occupied by the previous <br />road alignment and right-of-way which was not used for construction as to be vacated <br />and the easement relinquished to the property owner. This right-of-way vacation and <br />easement relinquishment appears to not have been finalized at that time. <br />In 2008 a non-exclusive water and sewer franchise was granted to Northland <br />Investments. This franchise agreement allows for water and sewer lines to be installed in <br />the White Road right-of-way to serve development near the Creekside Road area. The <br />franchise granted includes the area of White Road right-of-way which was not <br />constructed. Utility work to install a water main in the right-of-way was done in the first <br />half of 2022. <br />Public Works received a request from the adjacent property owner to vacate the <br />unconstructed portion of White Road right-of-way and the area occupied by the previous <br />alignment. <br />DISCUSSION: <br />The requested vacation allows the adjoining parcel to no longer be burdened by the right- <br />of-way. PW is proposing that no value be assigned to the right-of-way as no public <br />improvements have been created in a portion of the right-of-way. The portion of right-of- <br />way which had road improvements are no longer in use as the 2003 construction project <br />realigned the roadway. A subsequent record of survey by the property owners will clear <br />title and allow full use of the proponent's property. An easement for the private utility <br />will need to be maintained. <br />FISCAL IMPACTS: <br />The applicants have paid PW's vacation application fee of $3,888.00 <br />ATTACHMENTS: <br />Exhibit 1: Road Vacation Application <br />Exhibit 2: White Road Vacation Map <br />Page 2 of 2 <br />Public Works "Work Session Staff Report" 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.