My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-23-minutes-public-works-study-session
>
Meetings
>
2022
>
06. June
>
2022-06-07 10:00 AM - Commissioners' Agenda
>
2022-05-23-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 12:25:44 PM
Creation date
6/2/2022 12:24:14 PM
Metadata
Fields
Template:
Meeting
Date
6/7/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
90166
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chair Osiadacz <br />Kittitas County <br />May 13, 2022 <br />Page 3 of 4 <br />F. Kittitas Co Fire District #7, Chepoda Road, Cie Elum: Fire station constructed below <br />Base Flood Elevation. <br />o Action Required: There is a meeting scheduled with FEMA, ECY, & the County <br />for further discussion. <br />G. 6934 S. Canyon Road, Ellensburg: Unpermitted storage of materials. <br />o County sent letter to property owner 5/9/22 requesting compliance. <br />o Action Required: Submit copy of permit(s) and supporting application <br />documentation to ECY upon receipt. <br />Floodplain Damage Prevention Ordinance Review <br />The County's Flood Damage Prevention Ordinance, #2021-010, was revised August 17, 2021 <br />and is compliant with ECY and FEMA. <br />Review of Permitting Process <br />A preliminary site analysis is conducted for any activity that requires a building permit. A site <br />plan is then submitted with a description of the proposed project. This is dispersed amongst <br />multiple departments for review. The applicant is notified of what permits are needed. If the <br />project is in a Special Flood Hazard Area (SFHA) a Floodplain Development Permit (FDP) <br />application is submitted and the building department doesn't process the application until the <br />FDP is issued. A pre -application meeting is scheduled, which is mandatory for all residential <br />structures, or other structures required to elevate. Three elevation certificates are obtained: (Ist) <br />prior to construction; (2nd) at framing; (3rd) final. Elevation Certificate inspections are listed in <br />the County permitting system, SmartGov, and when the framing and final elevation certificates <br />are required the building inspectors will not schedule subsequent inspections until the ECs have <br />been reviewed and approved. The BFE must be located on the plans and everything below must <br />be floodproofed. During plan review, submittal is cross-checked with the preliminary site <br />analysis and elevation certificate. A red sticker is placed on plans that include a FDP to alert the <br />field inspector. Propane tanks are flagged for specific review. A FDP is processed for all <br />structures, even those under 200 square feet. Floodplains are required to be shown on plats and <br />BFEs are obtained prior to final plat approval for Zone A where there is 50 lots or 5 acres, <br />whichever is lesser. Letter of map changes are recommended when and where appropriate. <br />Examination of Permits & Files <br />Upon request, ECY was provided with a list of permits dating back five years from the date of <br />the CAV meeting, April 14th, and chose a sample from this list to review. This selection of <br />permits were reviewed in person on April 19th at the County Public Works Department. All <br />permits reviewed have been confirmed compliant except the following item that requires <br />resolution: <br />
The URL can be used to link to this page
Your browser does not support the video tag.