Laserfiche WebLink
3118!22, 11:24 AM <br />about:blank <br />Explanation: <br />H. The County's construction by county forces limit for 2021 computed in accordance with RCW 36.77.065: $1,267,161.25 <br />I. The actual expenditure for construction by county forces as reported in the 2021 Annual Const. Report: $200,200.00 <br />As required by WAC 136-20-060, a written Bridge and Inspection Report for 2021 was furnished to the legislative 02/03/2022 <br />authority on (attach a copy): <br /># of NBI Bridges as of December 31, 2021: 114 <br />aboul:blank 2/2 <br />