My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-28-minutes-public-works-study-session
>
Meetings
>
2022
>
04. April
>
2022-04-19 10:00 AM - Commissioners' Agenda
>
2022-03-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 12:28:27 PM
Creation date
4/14/2022 12:09:56 PM
Metadata
Fields
Template:
Meeting
Date
4/19/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
88364
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February <br />16 2022 <br />BRIDGE GROUP <br />GS <br />Kittitas County 2022 Bridge Inspections <br />Principal <br />Project <br />Senior <br />Senior <br />Design <br />Project <br />Manager <br />Engineer II <br />Engineer I <br />Engineer II <br />Coordinator <br />Item <br />SCOPE OF WORK <br />$208.14 <br />$174.84 <br />$159.47 <br />$130.44 <br />$115.52 <br />$103.10 <br />Cost <br />4 <br />CKy of C12 gluM Bridges <br />4.10 <br />MY of Cie Elum Inspections and Reports 4 Short Spans) <br />4.11 <br />Office Prep Wurk <br />3 <br />y3ar <br />4.12 <br />Short ftan Inspections <br />a <br />4.13 <br />QC Review of Reports <br />4 <br />#522 <br />Labor Subtotal: 0 0 <br />:y....... v a . L.< <br />i o <br />a <br />4 <br />:...,,,,............. <br />9 <br />�................................._.. <br />0 <br />$#,� 1 <br />....,..............., <br />5.10 <br />epo <br />Citi of KktHes Enspectlons_and.R...... Short Span) <br />...................... ....................................................E....................$........,............................................ <br />5.11 Office Pref Work° <br />° <br />2 <br />........................................................................................................................:....................................... ............. <br />5.12 Short Span inspectjons...................... : ...4 <br />.,. <br />5.13 <br />QC Review of Reports3 <br />t aoT. ,..,.., . <br />Labor Subtotal: <br />D <br />0 <br />O <br />3 <br />8 <br />D <br />IFt,0a4 <br />c1tv Af E11011111131112 1EW093- <br />-_ <br />6.10 <br />City of Ellensburg Ins ectlons and Report L8 NBI <br />, <br />6.11 <br />Office Prep Work <br />4 <br />g4gs <br />8.12 <br />Inspections <br />8 <br />$924 <br />6.13 <br />Report Preparation all NBI by KPFF <br />10 <br />6.14 <br />QC Review of Reports <br />fi <br />�' $783 <br />6.15 <br />Draft and Final Signed Submittals <br />4 <br />$qgg <br />L.a.bo.WrS.ubto.t.l.: <br />....... .--------- ................. <br />0 <br />..•--- <br />0 <br />--------- <br />-------- <br />2 <br />o <br />3 <br />Repair -a <br />7.10 <br />Bridge Inspection Repair List <br />1� <br />a <br />42 0,I <br />7.20 <br />Management Reserve <br />A <br />24 <br />--------- <br />..,,�,..,. <br />.�,..,.,..�..� <br />..•—_ <br />r1• .......Pp <br />Labor Subtotal' <br />O <br />26 <br />#6._,.b._n. <br />-.-.- <br />. - <br />Laooraum <br />S <br />47 <br />40 <br />779% <br />i� <br />$oi o'i9 <br />Reimbursable Sum: <br />$0 <br />kpff <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.