My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-28-minutes-public-works-study-session
>
Meetings
>
2022
>
04. April
>
2022-04-19 10:00 AM - Commissioners' Agenda
>
2022-03-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 12:28:27 PM
Creation date
4/14/2022 12:09:56 PM
Metadata
Fields
Template:
Meeting
Date
4/19/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
88364
Type
Minutes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February <br />113 2022 <br />BRIDGE GROUP <br />GS <br />Proj <br />Kittitas County 2022 Bridge a ins p ections Principal <br />`r <br />Senior <br />Senior Design <br />Project <br />er <br />Managriagt <br />Engineer 11 <br />Engineer) Engineer 11 <br />Coor4inatar <br />Item <br />SCOPE OF WORK $21)8.14 $174.64 <br />$159.47 <br />$130.44 $115.52 <br />$103.10 Cost <br />1 <br />PlaJoet Management and Coordination -- <br />- <br />----- <br />--� - - <br />1.]0 <br />Management <br />.... .......... <br />1.11 <br />. .... .............................................................................................................................�............................................................. <br />Contract Compliance 2 <br />2 <br />---•- ---------I........... .. <br />$677 <br />1.20 <br />Invoicin $Pro ress Summaries 12 months} 12 <br />12 $3,335 <br />1.30 <br />Client Communication (phone, small) 12 <br />$2,098 <br />1.40 <br />Internal Project Coordination 2 12 <br />$2-5.4 <br />1.50 <br />Safety Plan and Review 1 1 <br />2 <br />$614 <br />Labor Subk tel: 5 37 <br />r 0 i <br />2 2 <br />12 <br />;--- <br />- •.y . ,. ,v,. <br />............... .._.L.....--•--...... <br />. <br />2.10 <br />Travel J* Ellensburg <br />March/May 2 trips, 3 da .Includes Ellensbu brill es8 <br />5924 <br />2.20 <br />Au ustlSe tember 2 trips. 3 days( -6 <br />SsZ4 -_ <br />2.30 <br />October (2 trips, 3 da}Is:Indudes Cle Elum bridges} <br />..4.. <br />...... 8 <br />$924 <br />240••••• <br />.................................................................................... <br />November �2 topes 4 days: Indudes EIlensburE brid�e� <br />s........._.............................. <br />........ ...... <br />$924 <br />........ <br />2.50 8ecember �1 trips 2 days: Indudes Klttltas brides) ................ <br />..............................:....................a....................... <br />............. <br />E <br />_e <br />4 <br />2 fi0 <br />Inventory InsRectlons �1 dayr 1 t}IP� <br />° 4 ' <br />4 <br />.. <br />gt$ 100 <br />......... <br />......... <br />.......................................e........................................ <br />.... ........... <br />.. <br />Labor Subtotal: 0 0 <br />4 <br />0 40 <br />6 55 250 <br />, _5 <br />Inspections and Reports <br />3.10 <br />March/May Bridges.T NSI 16 shorts an <br />-_ <br />3.11 <br />Offlce PrejR Work <br />4 <br />SAE2 <br />3.12 <br />Ins ectlons <br />10 <br />10 <br />- iY. <br />- - <br />3:13 <br />Report Preparation <br />3.14 <br />..............................0•.............................................¢ <br />QC Review of Reports <br />.................. <br />10 <br />„ <br />3.15 <br />Drag and Final S' ned Submittals <br />" . <br />3.20 <br />Au ust1Se tember Brid es B N131,16 shorts en <br />3.21 <br />Office Pre Work <br />4 <br />$462 -� - <br />3.22 <br />Inspections <br />8 <br />17 <br />_ <br />3.23 <br />Report Preparation 4 NB!b Count Ins edor <br />6 <br />5883 <br />3.24 <br />QC Review of Reports14 <br />$1,826 <br />...............................................................................................................................................................$..................................................................,...._ .......-..._.. , <br />3,25 <br />Draft and Final Sighed Su6mitlais <br />! : 5 <br />5$76 <br />......¢.............................................................................. ------------ <br />.............................. ............... ......................................................................... .. ............... '[. ! V'Yr <br />..................................................................................... .. .. .. .. ..:... <br />3 30 <br />October Brides 114 NBI; 11 short spent <br />............................ ............... .....I ............. <br />3;34 Office Prep Work <br />....................I..................... <br />r <br />.................. . <br />5......... <br />-----.-_ . <br />............. <br />3 32 Ingpections 9 i .18 $9:6i4 <br />............................................................................... ........................................R......................................... ........ ................... <br />3.33 <br />Report Preparation 5 NB b Count In--- m-- <br />10 <br />X1,988 <br />3.34 <br />QC Review of Rs orts20 <br />$2 609609 <br />3.35 <br />Draft and Final 3i ned Submittals <br />3.40 <br />November Bridges 8 NBi 7 shortspan) <br />3.41 <br />Office P ep Work <br />6 <br />$BB� <br />3,42 <br />Inspections <br />s <br />27 <br />_ 14.544 <br />3.43 <br />Report Prearation 6 NBI by County Inspectoo <br />28 <br />_. $3.234' <br />3.44 <br />QC Review of Reports <br />24 <br />$3,130 <br />3.45 <br />Draft and Final S ned Submittals <br />14 <br />S?.557 <br />3.50 <br />December Bridges 18 shorts an <br />3.51 <br />Office Pre Work <br />4 <br />3.52 <br />iShort Span Inspections <br />16 <br />3.53 <br />QC Review of Re orts <br />12 <br />3.60 <br />Invento Inspections 1 NBI, 2 shorts an <br />3.81 <br />Office Prop Work <br />4 <br />5452 <br />3.62 <br />Ins actions <br />6 <br />$693 <br />3.63 <br />Report Prearatlon 1 NBI bride Incl Scour POA)10 <br />$1,t56 <br />3:64...._ <br />QC Review of Reports <br />4 $522 <br />9:65 <br />...................... <br />Draft and Final Signed <br />i <br />2 <br />_.___.._._.. <br />$237 <br />... .............................................._..._................... ............... ..............._......_.........�................. .............. .............. <br />Labor Subtotal: 0 0 <br />i. s <br />36 <br />1.84 203 <br />0 144,147 <br />kPff Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.