Laserfiche WebLink
KZTTZTAR 4cco WTY <br />DEPARTMENT OF PUBLIC WORKS <br />K[iTIfA3 COUNTY <br />• For "short -span" bridges, the KPFF Bridge Inspector will serve as inspection team leader <br />and will review (QC) the inspection report prepared by the County's co -inspector. The <br />County will provide a co -inspector who will prepare, sign and upload the "short -span" <br />bridge inspection reports to the WSBIS Bridge Inspection database. <br />• The field inspection schedule is anticipated to be as provided below: <br />TASK NO. 3.10 — March & May: County Bridge Inspections <br />4 7 NBI inspections <br />16 "short -span" bridge inspections <br />2 separate trips <br />• 3 days of on-site inspection <br />• Days on site includes time to inspect 7 Ellensburg NBI bridges (Task No. 6.10) <br />TASK NO. 3.20 —August & September 2022: County Bridge Inspections <br />• 9 NBI bridge inspections <br />• 16 "short -span" bridge inspections <br />• 2 separate trips <br />• 3 days on-site inspection <br />TASK NO. 3.30 - October 2022: County Bridge Inspections <br />• 14 NBI bridge inspections <br />• 15 "short -span" bridge inspections <br />t 2 separate trips <br />3 days on-site inspection <br />■ Days on site includes time to inspect 4 Cle Elum bridges (Task No. 4.10) <br />TASK NO. 3.40 - November 2022: County Bridge Inspections <br />29 NBI bridge inspections <br />7 "short -span" bridge inspections <br />• 2 separate trips <br />4 days on-site inspection <br />Days on site includes time to inspect 1 Ellensburg NBI bridge (Task No. 6.10) <br />