My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-046
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Res-2022-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:51:08 AM
Creation date
2/23/2022 11:50:43 AM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution for the 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
13
Placement
Consent Agenda
Row ID
86034
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Public Benefit: <br />Please describe the public benefit derived from project completion <br />The public benefits not only from the economic development opportunities, but also from the protection <br />of surface water bodies as road runoff from the urban area is treated through bioretention before <br />discharging into Crystal Creek. In addition, there is recognition that treating road runoff does prevent <br />contaminants from reaching surface water bodies, protecting both human and wildlife from exposure to <br />toxins that can be lethal to aquatic life or accumulate in fish, wildlifb and human tissue. <br />5. Define the total number of project partners demonstrating proiect support. <br />The Department of Ecology is curently the only paftner and providingS5% of the funding. <br />6. Explain how construction ready thie infrastructure project is relative to design completeness and the <br />permitting process. <br />Design Completeness - The alternatives analysis has been completed and the design is currently fully <br />funded with the Consultant (Mead&Hunt) preparing to submit the 30% level Plans and Specifications to <br />the City and Ecology for review. <br />Permitting Process - The project is in the review process for the Inadvertent Discovery Plan and <br />preparation of the SEPA Checklist. Survey work has already been completed and the geotechnical <br />investigation work is planned for December 2021. <br />7. lndicate the Estlmated Number of Short Term and/or Permanent Jobs Created/Retained by the Project. <br />Estimated Short Term Jobs created by the project would include jobs for consultants and contractors. <br />Consultant teams include at least (2) archaeologists, (2) geotechnical/soils professionals, (3) surveyors, <br />(3) design engineers. Contractor jobs are anticipated to be in the l5-20 range for tradespeople including <br />subcontractors. <br />The infrastructure project allows for the creation of development and/or redevelopment within the <br />drainage basin. Permanent jobs are anticipated as part of any development after the infrastructure project <br />is completed. Per Chapter 5 (Economic Development) of the City's Comprehensive Plan the employment <br />capacity is an additional 202 jobs. <br />Submit the original application to: <br />Kittitas County Department of Public Works <br />411 N. Ruby, Suite #1 <br />Ellensburgo WA 98926 <br />4
The URL can be used to link to this page
Your browser does not support the video tag.