My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-046
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
Res-2022-046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 11:51:08 AM
Creation date
2/23/2022 11:50:43 AM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution for the 2022 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
13
Placement
Consent Agenda
Row ID
86034
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE <br />1. Project Description; Describe the scope of work. lndicate the major work involved, including a brief <br />comparison of existing and proposed conditione, <br />The City of Roslyn drains to Crystal Creek, arr impaired watertrody. The Stormwater Retrofit and CIP <br />Construction will include a city-wide installation of low irnpact development (LlD) best management <br />practices (BMP) to improve water quality as part of the CIPI Project and in line with implernentation of <br />the City's planned capital improvement projects (CIP). The project will include stormwater retrofits for <br />improved water quality in conjunction with the on-going CIP 1, a funded pipe rehabilitation project <br />currently at 90Yo design. The goals are to construct BMPs that will improve flow control and reduce <br />flooding and pollutant discharges to the impaired waterway within the City of Roslyn, Crystal Creek. <br />Overall the City is requesting $262,500 for construction to complete a project where the total costs will <br />be approximately $3-million dollars. The attached Figures include the project area. The attached <br />Schedule and Budget include detailed Tasks for the Scope of Work. The attached Stormwater <br />Comprehensive Plan addendum includes detailed project information. <br />2. Explain how the infrastructure project wlll help meet the economic development goals of your community <br />and/or region. lf this project is not done, will the anticipated private development still take place? <br />The City currently expedences flooding in the downtown core due to undersized stormwater drains, and <br />adverse environmental impacts from the lack of water quality treatment within the same drainage basin. <br />The infrastructure project will help meet the economic development goals of the comnrunity by <br />providing an adequate stormwater system that will allow growth. Private commercial development is not <br />currently planned within the drainage basin as any new commercial development or redevelopment is <br />limited by the capacity of the stormwater system. Ifthe infrastructure project is not done the economic <br />development goals for the City will continue to be limited. <br />3. lndicate lf the proJect ls consistent with the following applicable state, regional and local plans and <br />prioritization processes: <br />tr Overall Economic Development Plan - Officiatty Adopted_ <br />Comprehensive Land Use Plan - Officially Adopted 2019 <br />I Capital Facility Plan - Officially Adopted 2019 <br />CommunityActionPlan(orothercommunity.basedplan)_offlclally,Adopted- <br />trSix.YearTransportatlonlmprovementPlan-official|yAdopted <br />Site-specific development plans; e.9., Community Master Plan - Officially Adopted_ <br />J <br />Other
The URL can be used to link to this page
Your browser does not support the video tag.