My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-08-minutes-ec-study-session
>
Meetings
>
2022
>
01. January
>
2022-01-04 10:00 AM - Commissioners' Agenda
>
2021-12-08-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 12:22:14 PM
Creation date
12/30/2021 12:20:38 PM
Metadata
Fields
Template:
Meeting
Date
1/4/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
84676
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C.) DIMMERS: <br />Dimmers should be "state of the art" quality and of more than sufficient numbers and power to cover <br />necessary lighting instruments as well as any added special effects lighting. <br />D.) FOLLOW -SPOTS: <br />PURCHASER will 12rovide, at PURCHASER'S sole cost and expense, at least two (2) follow -spots, <br />each of an appropriate size, lumen rating, and throw to match venue specifications. Please also provide <br />sufficient quantity of operators to control each follow -spot for the entire duration of ARTIST <br />performance. Final decisions regarding follow -spots to be determined with production manager <br />upon advance. <br />E.) TRUSS: <br />Minimum truss requirements call for the safe and proper rigging of an upstage and downstage truss, <br />each of an appropriate width to match the performance area of the stage. Downstage truss should be <br />flown out at least 4' AWAY from the downstage edge as to adequately light ARTIST and performers' <br />faces even if they are standing on the downstage lip. Upstage truss should be flown at minimum 15' <br />above upstage edge to accommodate EC Touring cloth backdrop (see next section). Upstage truss <br />should hang just BEHIND upstage edge (off deck) if at all possible. <br />F.) BACKDROP: <br />EC TOURING requires that production company provide a truss or pipe capable of hanging a 40'W x <br />20'H blow -through cloth backdrop weighing 25lbs. Minimum trim height to hang is 15' upstage. <br />Minimum width of truss or pipe to hang is 32'. <br />EC TOURING will provide the above-mentioned cloth blow -through backdrop. <br />NOTE: IfARTIST is the actprior to headline artist, production company must provide the truss <br />or pipe to be able to hang the 40'WX 20'H251b blow through backdrop at appropriate stage <br />depth to allow use of backdrop during ARTIST's set (i.e. in front of headliner's backdrop/ <br />upstage wall/ etc) <br />NOTE: Black Backdrop should be supplied by production company venue to conceal backstage <br />sightline. <br />G.) LIGHTING SYSTEM SET-UP TIME: PURCHASER will ensure that the lighting system is <br />SET-UP and OPERABLE, ready to focus, at least six (6) hours prior to start of PERFORMANCE. <br />H.) SYSTEM TECHNICIAN: PURCHASER agrees to provide two (2) skilled lighting technicians <br />familiar with the lighting system from load -in until end of PERFORMANCE to set up, focus, and <br />operate lighting system per instructions from ARTIST'S representative. <br />EASTON CORBIN RIDER 13 <br />Revised 08 April, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.