Laserfiche WebLink
EXHBIT .J (Rev. 1) to Development Agreement <br />Development Standards and Design Guidelines for <br />MountainS tar Master Planned Resort <br />December 2, 2008 <br />Section 1 -Introduction <br />Purpose of Development Standards <br />The foliO\ving development standards shall apply to the development and design of the <br />MountainStar Master Planned Resort (MountainStar) to ensure that MountainStar develops in a <br />manner that maintains the value of the project and its distinctiveness over the long-term. The <br />MountainStar development standards establish the construction criteria and design guidelines <br />to implement the MountainStar Conceptual Master Plan. These development standards will <br />provide greater predictability to Trend\vest, the County and other reviewing agencies, and the <br />public regarding the standards to be used in implementing MountainStar. <br />The purpose of these documents is to standardize design and construction elements. where <br />necessary, for consistency and to address the following additional purposes: <br />r Safety. <br />~ Predictability. <br />, Pleasant appearance. <br />,_ Economical construction and maintenance. <br />,. Provide for facilities that perform over the project's design life. <br />These standards are also intended to serve as a basis and guideline for County review of <br />speci fie Site Development Plans and other Subsequent Actions. as detined in the Development <br />Agreement, to implement the MountainStar Conceptual Master Plan. <br />Changes and Amendments to Development Standards <br />Changes or amendments to the Development Standards may be necessary during the 30-year <br />Term of the Development Agreement. In the event the County can demonstrate that a <br />Development Standard should be changed due to a specific life/safety issue or concern, then <br />the County staff may recommend, through the condition amendment process. additional <br />reasonable conditions to prospectively address such issue or concern in subsequent phases of <br />the development of Mountain Star in keeping with the concept of a master planned resort. <br />Section 2 -Grading, Erosion and Sedimentation Control <br />In order to maintain the natural setting of MountainStar. the extent of clearing associated with <br />project construction will be kept to reasonable minimums through project design and <br />implementation. The standards established by this Section shall apply to the design and <br />construction oftemporary erosion and sedimentation control (TESC) facilities for MountainStar. <br />-,. TESC Best Management Practices (BMPs) will conform to the then current version of <br />the Vv'ashington State Department of Ecology Storm Water management Manual for <br />Eastern Washington. <br />Suncadia Master Planned Resort Exhibit J-Development Standards <br />December 2. 2008 <br />Index #32