My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B-36 Use oftrails by cross-country skiers shall be restricted in areas identified as moderate or <br />high use area by winter elk. Winter use of hiking trails in the river bonom area that is used by <br />elk in winter shall be restricted. <br />B-37 Best management practices shall be implemented to control sediment and contaminants <br />from entering or impacting aquatic resources. <br />B-38 Bank annoring in connection with construction of recreational or utility facilities in the <br />shoreline shall be limited to the minimum necessary to protect such facilities from potential flood <br />damage and comply \vith all applicable county regulations. <br />B-39 To maintain future recruitment of large woody debris. any trees that must be removed <br />within the noodplain shall be dropped and left on the ground. Cutting of tire\vood within the <br />floodplain shall be prohibited. <br />B-40 Public access to the Cle Elum River tor lishing or other recreational activities shall be <br />managed to protect tish. fish habitat and the resources of the shoreline. If proposed. specific <br />design and use of new access areas shall conform to the requirements of the Kittitas County <br />Shoreline Master Program. <br />B-41 Managed access to the Cle Elum River shall continue consistent with the tenns and <br />conditions of the Development Agreement. Prior to occupancy of the proposed hotel, the <br />applicant shall submit a plan for the County's review to manage recreational access to the river. <br />This should include consolidation and management of access points and may propose <br />improvement oftrails and other facilities. consistent \vith the requirements of the Kittitas County <br />Shoreline Master Program. Access areas shall be defined and clearly mapped in cooperation <br />with federaL state and tribal agencies with expertise. <br />Air Quality. The EIS discusses adverse impacts to air quality and identifies mitigation measures <br />that should be implemented. Pursuant to Kittitas County SEPA Ordinance Section 15 .04.200( d). <br />and Comprehensive Plan Policy 2.194 and Section 4.3(8). the following mitigation measures <br />will be required. <br />B-42 Wood burning stoves shall be limited to common areas in the resort lodges. conference <br />facilities and similar spaces. No stoves or wood burning devices shall be installed in individual <br />resort units. The restriction of wood burning stoves shall be included to all privately owned units <br />including the single-family residences. This would allow the tire prevention to be implemented <br />from the highest standards and through out the MPR thus lowering the need lor fire department <br />response to wood stove related problems and also the problem of wood storage in a wildfire <br />interface area. <br />Wood storage in the wildland interface area presents a problem of possible fire encroachment <br />into the woodpiles and the radiant heat produced enhancing the fire front and making protecting <br />Suncadia l'viPR Conditions of Approval <br />December 2, 2008 <br />Page 13 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.