My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) The Plan shall consider the potential for achieving a goal of no net loss of elk forage <br />habitat. This shall include a discussion ofthe implications and habitat trade-offs involved <br />in emphasizing elk habitat relative to other habitat. In considering the goal of no net loss <br />of elk forage habitat, consideration should be given for increasing the quality of such <br />habitat in Managed Open Space areas to compensate for the unavoidable loss of elk <br />habitat in developed areas. <br />(d) The Plan shall follow the guidelines of: <br />• The Department of Natural Resources, Backyard Stewardship Program (Eastern <br />Washington Type) <br />• Recommendations for Fire Safety and Prevention of Forest and Rangeland in Kittitas <br />County including Rural, Commercial and Private Developments as updated March <br />1999 by the Kittitas County Fire Co-op, a committee of the Kittitas County Fire <br />Chiefs Association. <br />These guidelines shall be used to protect the wildtire interface area. which is being <br />developed. These are proven useful tools in fire protection. <br />B-30 Except as may otherwise be specifically approved by the BOCC. hunting and the use of <br />firearms shall be prohibited on the MPR site. ;'Hot hunts'' may be permitted if requested by <br />Trendwest and deemed necessary by the Washington State Department of Fish and Wildlife to <br />protect life and property. <br />B-31 Public access to salmon spawning areas of the Cle Elum River shall be restricted during the <br />spawning period. These areas shall be identified through consultation with the appropriate state, <br />tribal, and federal entities. Public access shall also be controlled where habitat enhancement <br />activities would be undertaken. <br />B-32 Motorized vehicle use shall be prohibited in the Cle Elum River Corridor. except at the <br />approved bridge and road crossing and for maintenance and public safety purposes. <br />8-33 Interpretive and educational materials regarding the range and sensitivity of\vildlife on the <br />MPR site, including information about potential cont1icts with elk, shall be developed by the <br />applicant, made available to resort visitors and/or posted in suitable locations on the property. At <br />the interpretive areas and trail heads, points where telephone service is not readily available, <br />communication devices of a type able to request emergency services shall be placed to allow the <br />users of such devices to be able to call for help. Without such communications wildfires will <br />have a chance to grO\v to a size that could endanger lives. <br />B-34 Trail ends and overlooks shall be located, through consultation with appropriate state. <br />tribal. and federal entities, a\vay from salmon spawning areas or othenvise designed to allow <br />viewing without disturbance to wildlife using the river. <br />B-35 Existing snags and downed woody debris within the Clc Elum River Corridor shall be <br />retained within natural open space areas. Further, large woody debris may be added to areas <br />where natural recruitment is shown to be inadequate. <br />Suncadia MPR Conditions of Approval <br />December 2, 2008 <br />Page 12 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.