My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a means of rapidly transmitting tire trom the native growth to any structure will be exempt. <br />A-9 The MountainStar Resort Conceptual Master Plan and the "budget" for land uses include <br />two golf courses on the property. An amendment ofthe Conceptual Master Plan has been made <br />by the County allowing a third golf course. Supplemental environmental review may be required <br />as provided in the Development Agreement subject to Kittitas County findings contained in a <br />Planned Action ordinance for the MPR. <br />A-1 0 The Cle Elum River Corridor shown in Figure 2-2 of the MountainStar EIS shall be <br />managed as Natural Open Space as identified in the EIS and consistent with the Land <br />Stewardship Plan approved by the County pursuant to Conditions A-5 and B-29. <br />B. NATURAL ENVIRONMENT <br />Geology, Soils and Groundwater. The EIS discusses adverse impacts to geology. soils and <br />ground water resources and identifies mitigation measures that should be implemented. Pursuant <br />to Kittitas County SEPA Ordinance Section 15.04.200 (d). Comprehensive Plan Policies GPO <br />2.194, 2.77. 2.78, and KCC 17A.04, 17A.05 and 17 A.06. the following mitigation measures will <br />be required. <br />Erosion <br />B-1 To mitigate and reduce sheet and channel erosion, the MPR shall employ Best Management <br />Practices (BMPs) as set forth in the Department of Ecology's then current Stormwater <br />Management Manual for Eastern Washington. BMPs shall include the following measures: <br />(a) Source-control BMPs for cleared areas shall be applied. Surface water runoff will be <br />directed away from exposed subgrades or into approved temporary and/or permanent <br />stormwater conveyance systems. <br />(b) Protective measures for stockpiled soils. <br />(c) Temporary sedimentation traps or ponds. <br />(d) Rock check dams along roadways and within drainage ditches <br />(e) Silt fences shall be established along wetlands, stream and river corridors. open space <br />areas and other sensitive areas. <br />(f) Erosion control measures for stormwater discharge points. <br />(g) Construction runoff shall be collected and treated by sediment ponds. turf-covered sand <br />filters, temporary filtration or other approved methods. <br />(h) Clean water entering construction areas shall not be allowed to mix with construction <br />water. <br />(i) A temporary erosion and sediment control plan (TESCP) shall be established and must be <br />approved by Kittitas County prior to beginning major clearing and earthwork activities, <br />including timber harvest. <br />When a nev. manual and new BMPs are adopted by Kittitas County, the MPR shall incorporate <br />the new BMPs into the design of any previously unapproved phases of development. Variances <br />may be considered to ensure compatibility between operational and maintenance BMPs <br />Suncadia MPR Conditions of Approval <br />December 2. 2008 <br />Page 4 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.