My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The MountainStar Resort Conceptual Master Plan, Development Agreement and <br />the MPR Project Development Permit and MountainStar MPR Conditions shall be implemented <br />through submission to and approval by the County of General Site Plans and Site Development <br />Plans in accordance with this Section 5.1. <br />General Site Plans may be submitted to the County in the discretion ofTrendwest <br />but shall not be a prerequisite to the submittal by Trendwest of a Site Development Plan for <br />County approval. The boundaries of a General Site Plan shall be determined by Trend west, and <br />may encompass a Resort area which includes one or more proposed Phases, a group of <br />Subphases. a Subphase. or a discrete element of the Resort. A General Site Plan may be <br />geographically broader than a subsequent. related Site Development Plan (e.g. a General Site <br />Plan may encompass an entire Phase while a subsequent, related Site Development Plan may <br />encompass only a single Subphase within such Phase). A General Site Plan is a planning tool <br />which provides a frame of reference that is more detailed than the MountainStar Resort <br />Conceptual Master Plan, but is less detailed than a subsequent, related Site Development Plan. <br />An approved General Site Plan provides the County with additional information with which to <br />evaluate a subsequent. related Site Development Plan(s), while also providing Trendwest with <br />County approval and planning certainty with respect to matters such as areas and types of land <br />use. general location of roadways. open space, recreational facilities and amenities, and overall <br />relationship to adjacent areas of MountainStar. <br />A Site Development Plan may address an area covered by a General Site Plan, or <br />a smaller area. General Site Plans and Site Development Plans shall be submitted to, reviewed <br />and approved by the County in accordance with this Section 5.1. <br />Suncadia Master Planned Reson Development Agreement (Amended and Restated 12-02-2008) Pagt: 35 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.