My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 Timing of Construction and Completion. Except as provided in a Site <br />Development Plan approved pursuant to Section 5.1 below or Applicable Law. there is no <br />requirement that Trendwest initiate or complete development of Mountain Star within any <br />particular period of time, and the County shall not impose such a requirement on any Subsequent <br />Action. Subject to the foregoing. the Parties agree that Trendwest shall be able to develop <br />MountainStar in accordance with Trendwest's own time schedule in light of market conditions. <br />and that Trendwest shall detennine the order in which Phases ofMountainStar shall be <br />developed. <br />Section 5. COOPERATION-IMPLEMENTATION <br />5.1 General Site Plan and Site Development Plan Process. <br />(a) Purpose. The planning and approval process for the development of <br />MountainStar is intended to proceed from the general to the specific, generally in the following <br />sequence: (i) MountainStar Resort Conceptual Master Plan; (ii) General Site Plan: (iii) Site <br />Development Plan(s): and (iv) platting (if required). The MountainS tar Resort Conceptual <br />Master Plan. as approved and conditioned through the MPR Project Development Penn it and <br />MountainStar MPR Conditions. together with the Development Ab,rreement. are intended to <br />provide the generaL conceptual development plan tor MountainStar. It is anticipated that field <br />conditions. market factors, environmental constraints and opportunities, design considerations <br />and other similar factors will cause the MountainStar Resort Conceptual Master Plan and <br />Development Agreement to change and be refined from time to time. Such changes and <br />refinements may be included in implementing the General Site Plans and Site Development <br />Plans described below. as well as in preliminary and final plats and building pennits. <br />Suncadia Master Planned Reson Development Agreement (Amended and Restated 12-02-2008) Page 34 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.