My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{viii) Industrial uses and capital facilities. utilities and services to <br />the extent necessary to maintain and operate MountainStar; <br />(ix) Temporary and/or permanent structures to serve as <br />MountainStar sales office(s); and <br />(x) Any other like or similar uses deemed by the Planning <br />Director to be consistent with the purpose and intent of the MPR Approvals and RCW <br />36. 70A.360. <br />(b) The following is a conditionally permitted use within <br />MountainStar, which use shall be reviewed and approved in accordance with Chapter 17.60 of <br />the Kittitas County Code, Conditional Uses: <br />(i) Campgrounds and recreational vehicle sites without power <br />and water. <br />(3) Phasing. The development ofMountainStar and all associated <br />infrastructure. including roads and bridges. and capital facilities, utilities and services (including <br />water supply and wastewater treatment facilities and services), may be approved and constructed <br />and/or bonded in Phases or Subphases. Development may be reviewed, approved and permitted <br />individually through the General Site Plan and Site Development Plan approval processes set <br />forth in Section 5.1 ofthis Agreement. All development approvals shall be consistent with the <br />MPR Approvals and this Agreement. <br />(4) Open Space Required. A cumulative total of at least eighty <br />percent (80%) of the Trendwest Property shall be preserved as Open Space. Pursuant to Sire <br />Development Plans approved under Section 5.1 of this Agreement, fifty percent (50%) Open <br />Space shall be met for each Phase. These cumulative and individual Phase Open Space <br />Suncadia Masler Planned Resort Development Agreement (Amended and Restated 12-02-200R) Page 25 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.