Laserfiche WebLink
*%,frEYURY <br />ENGINEERING <br />CENTURY WEST ENGINEERING <br />PLANNING LEVEL COST ESTIMATE <br />Kittitas County <br />BOWERS FIELD <br />Hangar Taxilane <br />September, 2021 <br />Subtotal s219,s00 <br />Approx. <br />Qtv Unit Unit Price Total Price <br />Item <br />No.Description <br />529,ooo.oo $29,ooo.ooMobilization1LS1 <br />t LS Slo,ooo.oo Slo,ooo.oo2Traffic Control <br />LS s1o,ooo.o0 Slo,ooo.oo3Construction Staking 7 <br />520,000.001LSS2o,ooo.oo4Contractor Quality Control <br />L LS s5,000.00 Ss,ooo.oo5Temporary Erosion and Sediment Control <br />s2o.oo S14,ooo.ooUnclassified Excavation 700 CY6 <br />S1,5oo.oo60CYS2s.oolEmbankment in Place <br />400 TN s2oo.oo s80,000.0084" Asphalt (P-401) <br />CY s6s.oo S:3,goo.oo96" Crushed Aggregate Base (P-209)520 <br />S1,2oo.oo300SFS4.oo10Pavement Marking <br />s11,000.00200CYsss.oo7tTopsoil <br />AC S5,ooo.oo S4,ooo.ooL2Seeding0.8