Laserfiche WebLink
-?7l HSxm 1it"*.upoa.ri,,,, <br />Economic Impact Calculator <br />Spendi ng Ernplgytlgnl Results <br />Economic lmpact by lndustry for TotalState V <br />Economic lmpacts Summary On Airport Jobs Temporary Construction Jobs Visitor Spending Jobs <br />Economic lmpacts Summary x <br />Bowers Field <br />Direct lmpact <br />On-Airport <br />Temporary Construction <br />Visitor Spending <br />125 $6,443,000 $10.781,000 $23,8s6.000 <br />$ i 9,439,000 <br />$686,000 <br />$3,731,000 <br />7B <br />4 <br />43 <br />$4,961,000 <br />$270,000 <br />$1 ,21 1,000 <br />$8,1 07,000 <br />$36s,000 <br />$2,309,000 <br />Supplier (lndirect) lmpact 39 $2.964,000 $4,901.000 $8.314.000 <br />$1,331,000 <br />i On-Airpoft <br />r Temporary Construction <br />Visitor Spending <br />34 $2,432,000 <br />$69,000 <br />$463,000 <br />s3,987,000 <br />$1 1 3,000 <br />$804,000 <br />794,00$6, <br />000$192,0 <br />5 <br />lncome Re-spending (lnduced) lmpact 48 $2,800,000 $s,0s7,000 $8,20s,000 <br />On-Airport <br />Temporary Construction <br />Visitor Spending <br />41 <br />0 <br />7 <br />92,247,000 <br />$96,000 <br />$4ss,000 <br />$4,058,000 <br />$171,000 <br />$823,000 <br />$6,s89,000 <br />$280,000 <br />$ 1,336,000 <br />Total lmpact 212 $12,207,OOO $20,738,000 $40,37s,000 <br />On-Airport <br />Temporary Construction <br />Visitor Spending <br />i53 <br />4 <br />55 <br />$9,641,000 <br />$434,000 <br />$2, 1 31 ,000 <br />$ 1 6,1 s3,000 <br />$6s 1,000 <br />$3,937,000 <br />$32,818,000 <br />$ 1 ,1 s6,000 <br />$6,401,000 <br />Copyright WSDOT @ 2020