Laserfiche WebLink
Project Costs <br />To prepare an estimate of probable construction costs for the TTC master plan, trails were divided into <br />geographic zones and segments. These trail segments can be built over time and will help organizers <br />phase in the full project implementation. The cost estimate is based on public bid and construct costs <br />and is provided in 2018 US Dollars. The trail lengths are based on the trail layouts shown on the master <br />plan graphic. See the Appendix for more detailed planning -level cost estimate breakdown and list of <br />assumptions. <br />Zone A Summary <br />Mobilization <br />Trails <br />Trail Signage <br />Trailhead 1 With Parking (Zone A - Ronald) <br />$37,922.40 <br />$260,509.00 <br />$7,600.00 <br />$107,115.00 <br />Zone A Trailhead Landscape <br />$0.00 <br />Site Amenities <br />$4,000.00 <br />Subtotal <br />$417,146.40 <br />Total (including tax, O&P, contingency) <br />$608,866.89 <br />Total Including design & permitting (20%) <br />$723,965.92 <br />Zone B Summary <br />Mobilization <br />$104,763.18 <br />Trails <br />$734,316.75 <br />Trail Signage <br />$24,400.00 <br />Trailhead 2 With Parking (Zone B - Roslyn) <br />$16,000.00 <br />Trailhead 3 With Parking (Zone B - Roslyn) <br />$171,635.00 <br />Zone B Trailhead Landscape <br />$85,280.00 <br />Site Amenities <br />$16,000.00 <br />Subtotal <br />$1,152,394.93 <br />Total (including tax, O&P, contingency) <br />$1,682,035.63 <br />Total including design & permitting (20%) <br />$2,000,004.44 <br />Zone C Summary <br />Mobilization <br />$109,622.78 <br />Trails <br />$558,262.75 <br />Trail Signage <br />$171,635.00 <br />Trailhead 4 With Parking (Zone C - Cle-Elum High School Area) <br />$171,635.00 <br />Trailhead 5 With Parking (Zone C - Cle Elum) <br />$171,635.00 <br />Trailhead 6 With Parking (Zone C - Cle Elum) <br />$16,000.00 <br />Trailhead 7 With Parking (Zone C - Cle Elum) <br />$107,115.00 <br />Zone C Trailhead Landscape <br />$53,300.00 <br />Site Amenities <br />$4,000.00 <br />Subtotal <br />$1,363,205.53 <br />Total (Including Tax, O&P, Contingency) <br />$1,760,059.43 <br />Total Including Design & Permitting (20%) <br />$2,092,777.70 <br />Total TTC Project Summary <br />Total (including tax, overhead & profit, and contingency) $4,050,961.94 <br />Total including design & permitting (20%) $4,816,748.06 <br />Towns to Teanoway Corridor Master Plan p 124 of 26 <br />Prepared for: Economic Development Group of Kittitas Co. & Kittitas Co. Parks and Recreation District No. 1 <br />Prepared by: J.A. Brennan Associates, Landscape Architects & Planners <br />