My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Notice RFP
>
Meetings
>
2021
>
09. September
>
2021-09-07 10:00 AM - Commissioners' Agenda
>
Notice RFP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2021 11:25:43 AM
Creation date
9/10/2021 11:25:39 AM
Metadata
Fields
Template:
Meeting
Date
9/7/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Notice of Request for Proposals for Barn and Garage Demolition and Salvage
Order
12
Placement
Consent Agenda
Row ID
80732
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
813112021 newspaper-text (z).html <br />Public Notice <br />Kittitas Countp Ellensburg WA <br />Barn and Garage Demolition and Salvage <br />AII submittals received after 4:00 PM tr'riday, October \2A21, will be discarded <br />PURPOSE <br />Kittitas County Department of Public Works is seeking demolition services removing one barn and one garagq salvaging <br />associated materials, disposing of unsalvageable materials, and removing all materials within the identified vicinity of these <br />structures. <br />SCOPE OF PROJECT <br />Two buildings will be demolished, salvage rights for the demolished buildings will belong to the selected service provider <br />(PROVIDER), and unsalvageable materials will be ploperly disposed by the service provider. The two buildings to be <br />demolished include l) a2,484 square-fbot barn-built ca. 1900, andZ) a 280 square-fbot garage with stained wooden shiplap, <br />with some areas of vertical wood board and some areas of plywood. Building photos are provided in Appendix A. <br />These structures are located on parcel 508933, at73l Stone Rd., Ellensburg Washington. The site is south of the city of <br />Ellensburg. This project is scheduled to commence in Fall or Winter 202I. AII tasks must be completed by February 28, <br />2022. <br />The work to be performed under this contract consists of the following general tasks. <br />1) Permits and Fees <br />PROVIDER is responsible for all permits, fees, inspections, and appror.als necessary to demolish the buildings as outlined <br />by the standards established by federal, state, and local authorities. Kittitas County has already conducted the necessary <br />cultural resources consultation necessary to demolish the buildings. <br />2) Building Demolition <br />PROVIDER shall demolish and remove all above and below ground debris and appurtenances including but not limited to <br />the main structure, all footings, foundations, floors, and debris of any kind. This task includes mobilizing labor and all <br />necessary ecluipment to the site, dismantling the building so that salvageable materials can be re-used, and unsalvageable <br />materials can be disposed. <br />3) Material Salvage <br />Salvage rights belong to the PROVIDER after Notice to Proceed is issued. All portions of the demolitions must be removed, <br />to include scrap metals, concrete, and other materials. The salvaged site shall be graded flat and level sufficient for grass <br />seeding. Contractor may sell any and all materials and retain any proceeds from the sale of such materials. It is the <br />expectation of Kittitas County that any proceeds earned by PROVIDER through recycling or salvaging will offset the costs <br />of demolition services. Any plans to sell materials directly from the site will need to be first coordinated with, and approved <br />in writing, by Kittitas County Department of Public Works. <br />4) Final Cleanup <br />No debris shall be left or buried on the site. All removal from this site of debris, rubbish, and other materials resulting from <br />demolition operations must be disposed of in a legal manner. All demolition debris must be taken to a licensed landfill. All <br />landfill receipts must be turned in before final approval and payment. Excavated areas associated with the removal of all <br />substructures should be backfilled with excavated materials on site. The site shall be graded flat and level ready for grass <br />seeding. <br />A review team within Public Works will review each submittal based on the scoring criteria provided below: <br />L Detailed understanding of project scope and tasks: 40 points <br />2. Material Salvage Plan and Cost Offset: 20 points. <br />file:///C:/Users/candie.leader/Downloads/newspaper-text (2). html 1/3
The URL can be used to link to this page
Your browser does not support the video tag.