My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-076 FCZD
>
Meetings
>
2021
>
05. May
>
2021-05-18 10:00 AM - Commissioners' Agenda
>
Res-2021-076 FCZD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 11:53:22 AM
Creation date
5/20/2021 11:52:30 AM
Metadata
Fields
Template:
Meeting
Date
5/18/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
i
Item
Request to Approve a Resolution to Authorize the Chair's Signature on an Amended Interlocal Agreement between Kittitas County Flood Control Zone District and the City of Ellensburg
Order
9
Placement
Consent Agenda
Row ID
76503
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A, - Scopo of Wsrk <br />REEGHR EREEK FLOONPLAIhU MAPPIhIG ANIS LEVES <br />CERTI FHCATIOhT $ TJ PPORT SERVICES <br />Scope of Work <br />Aspect Gonsulting LLC, February 4th,2020 <br />Background <br />Aspect Consulting, LLC (Aspect) has been selected by the City of Ellensburg to provide support <br />services related to floodplairr mapping and the potential certification of set-back levees along <br />Reecer Creek. The Kittitas County Flood Control Zone District (FCZD) is completing a flood <br />mapping project that includes lower Reecer Creek. The County's flood model does not currenly <br />include floodplain changes north of Dolarway Road that are being designed by the City, <br />specifically a set-back levee, bridge, and network of floodplain swales. lt is important for the <br />County's flood mapping project to be coordinated with, and account for the City's planned <br />improvements in the area. ln addition, FEMA's levee certification standards have changed <br />since the lower Reecer Creek levee was constructed. The new standards affect how the existing <br />and planned levees will be included in the FCZD's flood model and whether they will be formally <br />recognized by FEMA and the National Flood lnsurance Program (NFIP) as providing protection <br />during a 1O0-year flood to lands outside the levees. City coordination with the FCZD and FEMA <br />along with a systematic review of the levee standards, elevations, and tie-in locations is needed <br />to identify and quantify changes that may be needed to meet current levee certification <br />standards. <br />Phased Support Services <br />Aspect recommends a phased approach for the floodplain mapping and levee certification <br />support services: <br />1. The initial phase will involve: coordinating with the City, FCZD, and FEMA regarding <br />levee construction and certification standards, modeling methods, planned <br />improvements; and potentialchanges needed to rneet FEMA's standards. This phase <br />willalso involve providing levee, bridge, and floodplain swale design information to the <br />FCZD and interactions with the FCZD and their consultant regarding updated flood <br />modeling approaches and results. <br />2. A second phase would involve assembling or developing data and documentation to <br />support a request to FEMA for a modification of normal riverine levee freeboard <br />standards and final determination of design changes to the oxisting and planned levees <br />and related structures to meet FEMA's standards. <br />3. Work under subsequent phase(s), if any, will depend on the results and <br />recommendations from the initialtwo phases and decisions by the City. Subsequent <br />phase work could involve Aspect's support for additional technical investigations, <br />coordination with the County FCZD and their consultant regarding finalflood map <br />revisions, additional meetings with the City and/or FCZD, etc. <br />Reecer Creek Floodplaln Mapping and Levee Ceftification Support - Scope of Work page | 1"
The URL can be used to link to this page
Your browser does not support the video tag.