Laserfiche WebLink
IV <br />The County determines that the project is substantially consistent with the <br />Shoreline Master Program. The County shall make such determination in a timely <br />manner and provide it by letter to the project proponent. <br />Fish habitat enhancement projects that conform to the provisions of RCW <br />77.55.181 are determined to be consistent with local shoreline Master Programs, <br />as follows: <br />a. ln order to receive the permit review and approval process created in this <br />Section, a fish habitat enhancement project must meet the criteria under <br />pg.iv(a)(1) and (2) in this subsection: <br />1. A fish habitat enhancement project must be a project to accomplish one <br />or more of the following tasks: <br />i. Elimination of human-made fish passage barriers, including culvert <br />repair and replacement, and fish passage barrier removal projects <br />that comply with the forest practices rules. as the term "forest <br />practices rules" is defined by RCW 76.09.020; or <br />ii. Restoration of an eroded or unstable stream bank employing the <br />principle of bioengineering, including limited use of rock as a <br />stabilization only at the toe of the bank, and with primary emphasis <br />on using native vegetation to control the erosive forces of flowing <br />water;o1e+ <br />iii. Placement of woody debris or other instream structures that benefit <br />naturally reproducing fish stocks; or <br />iv. The restoration of native kelp and eelgrass beds and restoring native <br />oysters. <br />iii-.v. The Washington State Department of Fish and Wildlife shall develop <br />size or scale threshold tests to determine if projects accomplishing <br />any of these tasks should be evaluated under the process created in <br />this Section or under other project review and approval processes. A <br />project proposal shall not be reviewed under the process created in <br />this Section if the Washington State Department of Ecology <br />determines that the scale of the project raises concerns regarding <br />public health and safety,'-and <br />2. A fish habitat enhancement project must be approved in one of the <br />following ways: <br />i. By the Washington State Department of Fish and Wildlife pursuant <br />to RCW Chapter 77.95 or 77.100; <br />ii. By the sponsor of a watershed restoration plan as provided in RCW <br />Chapter 89.08; <br />iii. By the Washington State Department of Ecology as a WDFW- <br />sponsored fish habitat enhancement or restoration project; <br />iv. Through the review and approval process for the Jobs for the <br />Environment Program; <br />v. Through the review and approval process for conservation district- <br />sponsored projects, where the project complies with design <br />Exhibit C SMP Update | 178.07.030 Permit Exemptions Page 7 of 10