RESOLUTION NO. <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS OF KITTITAS COUNTY, STATE OF WASHINGTON, in the matter <br />of initiating a county road project designated as: <br />CRP NO: 304-20 JOB NO: RC2093 <br />IT IS HEREBY RESOLVED for Hungry Junction Road (M.P. 0.00-1.74) Improvements <br />The existing BST pavement is narrow with areas of significant longitudinal cracking and settling over the top of drainage <br />structures. This existing pavement will be removed and replaced per design. There are also four vertical curves that need <br />to be corrected to meet safe sight stopping distance design standards for the posted speed limit. The road will be <br />widened, and above ground obstacles will be removed or relocated, guardrail installed or slopes flattened where <br />warranted. <br />ARTERIAL ❑ <br />ACCESS <br />This project is hereby declared to be a public necessity and the Director of Public Works acting as the County Engineer is hereby <br />ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.80.070). <br />IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the Director of <br />Public Works' estimate, is hereby made in the amounts and for the purposes shown: <br />PURPOSE <br />AMOUNT <br />TOTALS <br />PRELMINARY ENGINEERING <br />$ 504,044 <br />CONSTRUCTION ENGINEERING <br />$ 168,015 <br />RIGHT-OF-WAY ACQUISITION <br />$ 50,000 <br />SUB -TOTAL <br />$ <br />is <br />722,059 <br />County Forces CONSTRUCTION <br />$ <br />CONTRACT CONSTRUCTION <br />$ 3,629,119 <br />SUB -TOTAL <br />3,629,119 <br />TOTAL PROJECT COST <br />$ <br />4,351,178 <br />GRANT OR OTHER FUNDS <br />$ <br />3,631,500 <br />Grant Source: RAP <br />Is <br />TOTAL COUNTY ROAD FUND ALLOCATION <br />719,678 <br />_osh Fredrickson, P.E. <br />County Engineer <br />® THIS PROJECT IS INCLUDED IN THE OFFICIALLY ADOPTED 2021 ANNUAL ROAD PROGRAM AS <br />ITEM NO. 12 <br />❑ THIS PROJECT IS HEREBY MADE A PART OF THE OFFICIALLY ADOPTED ANNUAL ROAD PROGRAM IN <br />ACCORDANCE WITH RCW 36.81.130 <br />IT IS FURTHER RESOLVED THAT: <br />® THE CONSTRUCTION IS TO BE ACCOMPLISHED BY CONTRACT IN ACCORDANCE WITH RCW 36.77.020 ET.SEQ. <br />❑ THE CONSTRUCTION IS TO BE ACCOMPLISHED BY COUNTY FORCES IN ACCORDANCE WITH RCW 36.77.065 AND <br />WAC 136-18. <br />ADOPTED this day of <br />BOARD OF COUNTY COMMISSIONERS <br />KITTITAS COUNTY, WASHINGTON <br />Brett Wachsmith, Chair <br />2021. Attest: <br />Clerk of the Board <br />Laura Osiadacz, Vice -Chair <br />Cory Wright, Commissioner <br />g:\base\forms\eng\crp-frm 4/28/2021 <br />