Laserfiche WebLink
Kittitas County Public Works <br />2021 Proposed Fee Schedule <br />Road: <br />50000 <br />97200 <br />970-00 <br />Fees for Planning Services <br />Current Fee <br />Cost of Service <br />Suggested Fee <br />I <br />Access Permit <br />270.00 <br />85050 <br />43700 <br />Address Permit w/plate <br />100.00 <br />183.00 <br />183.00 <br />Budding Move Permit <br />80000 <br />91125 <br />900-00 <br />Conditional Use Permit <br />1,140.00 <br />1,215.00 <br />1,140.00 <br />Franchise Fee (6his included, billed monthly far cost exceeding 6 his) <br />2,61500 <br />i,613-52 <br />1,61500 <br />Haul Route Permit (3 hrs Included, billed monthly for cost exceeding 3 hrs) <br />750.00 <br />729.00 <br />750.00 <br />Land Use Permit (5 hrs included, billed monthly for cast exceeding 5 hrs) <br />various <br />various <br />1,215AD <br />Lot Consolidation <br />150.00 <br />588.06 <br />586.00 <br />On System County Road Establishment <br />3,770 DO <br />4,009 50 <br />3,770 00 <br />Over Welght/Super load <br />750.00 <br />729.00 <br />750.00 <br />Preliminary Site Analysis/meeting <br />110 DO <br />220-00 <br />220-00 <br />Private Bridge/Road Inspection (8hrs included, billed monthly for cost exceeding 8 hrs) <br />2,860.00 <br />1,944.00 <br />1,944.00 <br />Private Road Name Establishment <br />400 00 <br />75330 <br />750.00 <br />Road Standard Variance <br />1,000.00 <br />1,074.06 <br />1,075.00 <br />Road Standard Va lance Appeal <br />I,S80.00 <br />1,94400 <br />1,94400 <br />Road Vacate <br />4,205.00 <br />3,888.00 <br />3,888.00 <br />Road Closure Requests <br />97200 <br />972 DO <br />Right of Way <br />475.00 <br />850.50 <br />850.00 <br />Sepa (2 hrs included, billed monthly for cost exceeding 2 hrs) <br />250-00 <br />952-55 <br />95000 <br />Road Sign Review <br />364.50 <br />243.00 <br />Transportation Concurrency (12hrs included, billed monthly for cost exceeding 12 hrs) <br />3,69000 <br />various <br />3,690.00 <br />Vehicle Towing <br />- <br />972.00 <br />972.00 <br />Road: <br />Sales: Current Fee Cost of Service Suggested Fee <br />Road Atlas 30-00 3000 <br />Address Plate 50.00 192.OD 61.00 <br />Flood.Corwol: <br />Sales: Current Fee Cost of Service Suggested Fee <br />Flood Plain Management Permit (4hrs included, billed monthly for cost exceeding 4 hrs) <br />50000 <br />97200 <br />970-00 <br />CLOMR Permit (8 hrs included, billed monthly for cost exceeding 8 hrs) <br />2,000.00 <br />1,944,00 <br />1,940.00 <br />Flood development Permit (Piopane Tank, Solar Panels, Other) <br />5500 <br />26100 <br />12000 <br />Shoreline Permit <br />550.00 <br />552.00 <br />550.00 <br />Water Resource: <br />Mitigation and Metering Program Fees <br />Current Fee <br />Cost of Service <br />Suggested Fee <br />Water Mitigation Package A <br />3,89500 <br />3189500 <br />Water Mitigation Package B <br />4,810.00 <br />4,810.00 <br />Water Mitigation Package C (Cisterns) <br />2,78000 <br />2,78000 <br />Water Metering Annual Fee <br />180.00 <br />180.00 <br />Meter Inspection fee (Non -County water) <br />370-00 <br />37000 <br />