My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-13-minutes-solid-waste-and-maintenance
>
Meetings
>
2021
>
05. May
>
2021-05-04 10:00 AM - Commissioners' Agenda
>
2021-04-13-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 12:54:29 PM
Creation date
4/29/2021 12:54:17 PM
Metadata
Fields
Template:
Meeting
Date
5/4/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
75943
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Courthouse Committee / Community Outreach <br />DLR Group Fee Proposal <br />March 8, 2021 <br />Base Scope of work <br />Knutzen Engineering <br />TBC <br />Project <br />Kick off Meeting <br />Scope <br />MEETING <br />Schedule <br />2 Hours <br />$ <br />1,250. <br />Review of existing reports & studies <br />ongoing <br />Rendering - Cost per option. <br />$ <br />4,000 <br />Commu nication Gathering <br />Meeting with Executive Team - 3 meetings <br />April <br />MEETING <br />3 hours <br />$ <br />6,000 <br />SWOT (or similar) Report <br />Report <br />$ <br />$ <br />3,000 <br />Review of existing sites - Assume 4 <br />ongoing <br />TBC <br />$ <br />12,000 <br />Development of Site Test Options - Assume 4 <br />ongoing <br />$ <br />$ <br />25,000 <br />Develop Public Involvement Plan (PIP) <br />Meeting with Executive Team - 2 meetings <br />May -June <br />MEETING <br />3 hours <br />$ <br />4,000 <br />Draft of PIP for review and comment <br />ongoing <br />Implementation of Public Survey <br />$ <br />15,000 <br />Preparation for Implementation <br />ongoing <br />- <br />$ <br />10,000 <br />the PIP <br />Meeting with Executive Team - 2 meetings <br />July-SeptemberImplement <br />MEETING <br />3 hours <br />$ <br />4,000 <br />PIP Implementation Support <br />ongoing <br />$ <br />10,000 <br />Public / Commissioner Meetings - Assume 4 total, includes travel time <br />PUBLIC MTG <br />$ <br />16,000 <br />Compilation of findings <br />ongoing <br />$ <br />15,000 <br />Final Report <br />Report <br />$ <br />2,500 <br />DLR <br />Group Base .. - <br />Fee Total <br />$ <br />127,750 <br />Additional Scone not included in base scone - To Be Confirmed Prior to Work <br />Civil Site Analysis - Cost per option <br />Knutzen Engineering <br />TBC <br />- <br />Cost Estimating of Conditions - Cost per option <br />Roen Associates <br />TBC <br />- <br />Rendering - Cost per option. <br />DLR Group <br />$ <br />2,000 <br />$ <br />2,000 <br />Physical Model - Cost per option including materials <br />DLR Group <br />$ <br />9,000 <br />$ <br />9,000 <br />Assessment of LEED / Sustainability Criteria <br />DLR Group <br />TBC <br />- <br />Attendance at additional public / Commissioner meeting - Virtually <br />DLR Group <br />$ <br />2,500 <br />$ <br />2,500 <br />Graphic Design for Public Messaging - Dependent on Scope following Base Scope <br />DLR Group <br />TBC <br />- <br />Implementation of Public Survey <br />TBC <br />TBC <br />- <br />Travel to Ellensburg in lieu of virtual meeting (3 people) <br />DLR Group <br />$ <br />4,000 <br />$ <br />4,000 <br />Reimbursables charged at cost plus 10% <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.