My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-059 Award Bid
>
Meetings
>
2021
>
04. April
>
2021-04-20 10:00 AM - Commissioners' Agenda
>
Res-2021-059 Award Bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 1:36:22 PM
Creation date
4/22/2021 1:35:45 PM
Metadata
Fields
Template:
Meeting
Date
4/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve a Resolution to Award Bid on the Phase 1 Road and Utility Improvements for the New transfer Station Location
Order
4
Placement
Consent Agenda
Row ID
75326
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 04 <br />KITTITAS COU NTY TRANSFER STATION <br />PHASE 1 - ROAD AND UTILITY IMPROVEMENTS <br />KITTITAS COUNW <br />ELLENSBURG, WASH INGTON <br />Date(s) lssued: <br />March 31,2A21 <br />The fottowing shall. be incorporated into the Contract Documents for the subject project and shatl govern <br />the work taking precedence over previously issued documents covering the items noted. At[ conditions not <br />modified shat[ remain unchanged. <br />REVISE INVITATION TO BID <br />Response to Questions from Bidders: <br />Ouestion: For pay item 2O Clear and Grub. there is no reference to what you want done with the <br />excess spoils that can't be re-used as topsoit. ls the intent to leave the excess on site in a <br />stockpite, spread-out, or export off site? <br />The contractor shall haul excess C&G material to a stockpile onsite located within 25O' of <br />the collector road. <br />Ouestion: For Pay items 13, 14. 15. Conduit oioe in. Diam.. With City of El.lensburg oversight <br />will a ticensed etectrician stitl be needed to assemble. bed. and backfitt the conduits if the city is <br />going to be oroviding and instatting the conductors themsetves. <br />A Journeyman Lineman tS NOT required to installthe conduit or perform any of the <br />excavation. A City Light Quolified Worher lS required to be onsite to approve conduit <br />installation. <br />A Journeyman Lineman IS required to provide grounding for the concrete vaults if they <br />aren't manufactured with internal grounding. <br />A Journeyman Lineman lS required to provide grounding for the fiberglass vault. <br />StreetlightvauLts and bases do not require grounding, so a Journeyman Lineman and/or <br />Journeyman Electrician lS NOT required. <br />Question: Regarding Addendum No. 3. ltem No. 5 (gl (hl (i\ - As these documents woutd not be <br />executed until Notice of Award has been received, therefore qlpicatly not be required as part of <br />a Bid Prooosal package, please confirm that you are requesting the "Sample"/blank documents <br />to be included within the Bid Proposat package. <br />Item No. 5 (g) (h) (i) are required as samples <br />Ouestion: ls there a cross section for the road on this project? <br />On sheet TYPI (5 of 31) of the drawing set there is a Typical Road Section.
The URL can be used to link to this page
Your browser does not support the video tag.