Laserfiche WebLink
22 <br /> <br />Priority 5: Bridge Rail Improvements <br />Code 1 <br /> <br />• Phase 1 is within County Maintenance Districts A-D with 2 bridges or structures. <br />o ESTIMATED COST $478,583 <br />• Phase 2 is within County Maintenance District E with 1 bridge or structures. <br />o ESTIMATED COST $1,063,507 <br />• Phase 3 is within County Maintenance District F-L with 17 bridges or structures. <br />o ESTIMATED COST $518,192 <br />• These bridges or structures will need upgraded rail and approaches to be brought up to standards to <br />prevent serious injury or fatality accidents if collision should occur. <br /> <br /> <br />