My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_ILA State Parks_Gingko
>
Meetings
>
2021
>
04. April
>
2021-04-06 10:00 AM - Commissioners' Agenda
>
Resolution_ILA State Parks_Gingko
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:44:44 PM
Creation date
4/1/2021 12:44:26 PM
Metadata
Fields
Template:
Meeting
Date
4/6/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
x
Item
Request to Approve a Resolution Authorizing the Chair's Signature on an Interlocal Agreement with Washington State Parks for Design and Construction Services for Ginkgo State Park Parking Lot Improvements
Order
24
Placement
Consent Agenda
Row ID
74277
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dept. of Public Works <br />Page 2 <br />1. Provide complete project management necessary to deliver the PROJECT within <br />mutually agreed expectations, including progress reports, schedule updates, and invoice <br />preparation. <br />2. Attend meetings with the STATE regarding technical aspects of the work. It is <br />anticipated up to two (2) meetings may be held at mutually agreed location. <br />3. Perform field visit necessary to confirm aspects of the design. <br />4. Submit preliminary plans, design assumptions and cost estimate. <br />5. Based on approved preliminary plans and estimate, finalize, submit and review 90% <br />plans and estimate with the STATE. <br />6. Based on approved 90% plans and attached cost estimate, finalize, and submit 100% <br />plans and cost estimate to the STATE. <br />7. Perform in-house quality control and assurance review. <br />8. Furnish electronic copies of the final plans and estimate in .pdf format. <br />9. Prepare and submit Engineer's Opinion of Cost. <br />Deliverables: <br />PHASEI— <br />Preliminary plans and cost estimate <br />Plans, cost estimate at 90% and Final completion <br />Electronic copies of final plans and estimate in .pdf format <br />PHASE II— <br />Based on availability of KCPW resources, Equipment, material, and labor to construct <br />improvements outlined on the design documents. <br />Construction management <br />ADDITIONAL SERVICES <br />For services not included in the Scope of Work, the STATE may request KCPW complete <br />additional services, as mutually agreed, at the rates in affect at the time of service. <br />TIME OF PERFORMANCE: <br />ENGINEERING DESIGN, PLANS, ESTIMATE, AND BIDDING <br />PHASEI- <br />All work described in the Scope of Services above shall begin upon authorization to proceed and <br />be completed no later than April 23, 2021. <br />PHASE II — <br />At the request of the STATE, construction work is to be complete by June 30, 2021. <br />FEE FOR SERVICES: <br />For the services furnished by KCPW as described above, STATE agrees to pay KCPW the fees <br />as set forth herein. The maximum amount listed below may be revised only by written agreement <br />of both parties. <br />411 N. Ruby St, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.