My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_ILA State Parks_Gingko
>
Meetings
>
2021
>
04. April
>
2021-04-06 10:00 AM - Commissioners' Agenda
>
Resolution_ILA State Parks_Gingko
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2021 12:44:44 PM
Creation date
4/1/2021 12:44:26 PM
Metadata
Fields
Template:
Meeting
Date
4/6/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
x
Item
Request to Approve a Resolution Authorizing the Chair's Signature on an Interlocal Agreement with Washington State Parks for Design and Construction Services for Ginkgo State Park Parking Lot Improvements
Order
24
Placement
Consent Agenda
Row ID
74277
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />KITT,TAS COUNTY Mark R. Cook, PE Director <br />EXHIBIT A <br />SCOPE OF WORK <br />_Ginkgo State Park Parking Lot Improvement <br />Vantage Highway Milepost 25.75 <br />Washington State Parks (STATE) desires to make improvements to their parking lot serving <br />Ginkgo State Park adjacent to Vantage Highway. The parking lot is located at approximate <br />milepost 25.75 on the north side of Vantage Highway. The parking lot is currently gravel with <br />one access at the eastern side, a solar powered charging station and pit toilet are also on the site. <br />The project is to be completed in two phases. Phase I includes engineering and design of the <br />parking lot improvement. Phase II is construction support of said improvements. Phase II will be <br />authorized by Washington State Parks providing work can be completed by June 30, 2021. <br />Kittitas County Public Works (KCPW), shall provide professional services to the Washington <br />State Parks for the Ginkgo State Park Parking Lot Improvement project (PROJECT) as outlined <br />in the Work Task descriptions below. The following general provisions/assumptions have been <br />made: <br />A. Work conducted will meet STATE design standards. <br />B. It is anticipated that one (1) bid package including plans and estimate will be prepared for <br />all elements of the PROJECT. <br />C. Specifications for construction will use Washington Department of Transportation <br />Standard Specifications for Road, Bridge, and Municipal Construction 2021. <br />D. Project specific specifications are not anticipated. <br />E. All necessary permits will be obtained by STATE <br />F. The STATE shall pay all fees for permitting, advertising or other associated fees <br />necessary for the PROJECT. <br />G. No federal funds shall be used in design or construction of the PROJECT. <br />H. All calculations, analyses, design, plans, specifications, and other project work will be <br />prepared in English units. The use of metric units for any aspect of the work will not be <br />required. <br />I. It is understood and agreed that tasks may be added or deleted from the scope of services <br />by mutual agreement between the STATE and KCPW. <br />J. Construction is to be completed by KCPW. <br />Kittitas County Public Works agrees to perform the following services: <br />ENGINEERING DESIGN, PLANS, ESTIMATE AND CONSTRUCTION SUPPORT <br />411 N. Ruby St, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.