My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021 - 2026 Capital Improvement Program for Adopting Ordinance
>
Meetings
>
2021
>
01. January
>
2021-01-05 10:00 AM - Commissioners' Agenda
>
2021 - 2026 Capital Improvement Program for Adopting Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2021 9:34:30 AM
Creation date
12/31/2020 1:34:13 PM
Metadata
Fields
Template:
Meeting
Date
1/5/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
i
Item
Requesting to Approve an Ordinance Adopting the Kittitas County Capital Improvement Program for the Planning Period 2021-2026
Order
9
Placement
Consent Agenda
Row ID
70983
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AREANon-Local Source2021 Local2021 Non-Local2022 Local2022 Non-Local2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2026 Non-LocalKITTITAS COUNTY FLOOD CONTROL ZONE <br />2021-2026 <br />SIX YEAR CAPITAL IMPROVEMENT PLAN <br />#10 Wilson-Naneum Cherry SRFB 80 124 496 <br />#11 Wilson-Naneum Cherry 100 <br />#12 Wilson-Naneum Cherry FCAP 20 80 100 400 <br />#13 Yakima Mainstem SRFB 4 100 <br />#14 Wilson-Naneum Cherry Ecology 20 70 270 <br />#15 Wilson-Naneum Cherry Ecology 20 82 290 <br />#16 Crystal Creek 20 100 <br />#17 Manastash FCAP 200 <br />204 3447 324 686 234 420 95 660 190 690 382.0 690 <br />Whiskey Reroute Design <br />WHISKEY CREEK AT EWC SIPHON <br />Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing current EWC <br />crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost-share. Cost estimate based on 2016 KCCD <br />SRFB proposal, adjusted for inflation. <br />WNC-Phase 2 <br />Whiskey Reroute Feasibility Study <br />Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate effects of <br />Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at proposed railroad <br />crossing, and within Reecer Creek floodplain site, and water needs downstream of proposed reroute site. <br />WNC-Phase 3 <br />Implement capital recommendations from Phase 2 Feasibility Study <br />REACH ASSESSMENT (THORP TO GLADMAR) <br />Assessment to identify and prioritize flood alleviation and habitat restoration actions in a 4-mile <br />reach of the Yakima River, extending from just upstream of Thorp, to Gladmar Park and the I-90 <br />river crossing. Request SRFB funding in 2023 round for implementation in 2024/2025. <br />FLOW CONVEYANCE RESTORATION - SITE 2 <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />FLOW CONVEYANCE RESTORATION - SITE 3 <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />CRYSTAL CREEK CONVEYANCE PROJECT <br />Implement project identified through Crystal Creek CTP study <br />MANASTASH - COVE ROAD REPLACEMENT <br />Replace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and flood flows. 2026: <br />Design and Permitting <br />CAPITAL PROGRAM ANNUAL TOTAL (LOCAL AND NON-LOCAL AMOUNTS IDENTIFIED)
The URL can be used to link to this page
Your browser does not support the video tag.