Laserfiche WebLink
AREANon-Local Source2021 Local2021 Non-Local2022 Local2022 Non-Local2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2026 Non-LocalKITTITAS COUNTY FLOOD CONTROL ZONE <br />2021-2026 <br />SIX YEAR CAPITAL IMPROVEMENT PLAN <br />#10 Wilson-Naneum Cherry SRFB 80 124 496 <br />#11 Wilson-Naneum Cherry 100 <br />#12 Wilson-Naneum Cherry FCAP 20 80 100 400 <br />#13 Yakima Mainstem SRFB 4 100 <br />#14 Wilson-Naneum Cherry Ecology 20 70 270 <br />#15 Wilson-Naneum Cherry Ecology 20 82 290 <br />#16 Crystal Creek 20 100 <br />#17 Manastash FCAP 200 <br />204 3447 324 686 234 420 95 660 190 690 382.0 690 <br />Whiskey Reroute Design <br />WHISKEY CREEK AT EWC SIPHON <br />Increase flood conveyance, eliminate canal / creek intermingling, and address fish passage barrier by replacing current EWC <br />crossing at Whiskey Creek with a siphon. KCCD managed project, with FCZD cost-share. Cost estimate based on 2016 KCCD <br />SRFB proposal, adjusted for inflation. <br />WNC-Phase 2 <br />Whiskey Reroute Feasibility Study <br />Hydrologic analysis with existing 2-d model to evaluate Whiskey Creek tie-in at Reecer Creek project. Evaluate effects of <br />Mercer Creek flow routing north of the airport on hydrologic regime, design specification needed at proposed railroad <br />crossing, and within Reecer Creek floodplain site, and water needs downstream of proposed reroute site. <br />WNC-Phase 3 <br />Implement capital recommendations from Phase 2 Feasibility Study <br />REACH ASSESSMENT (THORP TO GLADMAR) <br />Assessment to identify and prioritize flood alleviation and habitat restoration actions in a 4-mile <br />reach of the Yakima River, extending from just upstream of Thorp, to Gladmar Park and the I-90 <br />river crossing. Request SRFB funding in 2023 round for implementation in 2024/2025. <br />FLOW CONVEYANCE RESTORATION - SITE 2 <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />FLOW CONVEYANCE RESTORATION - SITE 3 <br />Implementation of project similar to Mercer at Helena flow conveyance project, site TBD <br />CRYSTAL CREEK CONVEYANCE PROJECT <br />Implement project identified through Crystal Creek CTP study <br />MANASTASH - COVE ROAD REPLACEMENT <br />Replace existing Cove Road bridge with bridge of sufficient freeboard and span to pass sediment and flood flows. 2026: <br />Design and Permitting <br />CAPITAL PROGRAM ANNUAL TOTAL (LOCAL AND NON-LOCAL AMOUNTS IDENTIFIED)