Laserfiche WebLink
AREANon-Local Source2021 Local2021 Non-Local2022 Local2022 Non-Local2023 Local2023 Non-Local2024 Local2024 Non-Local2025 Local2025 Non-Local2026 Local2026 Non-LocalCAPITAL IMPROVEMENT PROJECT NAME <br />#1 Yakima River 100 20 60 <br />#2 Yakima River - Ringer Reach 2950 <br />#3 Ringer Reach IP 395 50 50 5 50 <br />#4 Ringer Reach IP 102 <br />#5 Ringer Reach SRFB 80 90 510 90 510 <br />#6 Wilson-Naneum Cherry <br />City of <br />Ellensburg <br />#7 WNC & Teanaway 80 <br />#8 General CTP 24 60 60 60 100 60 100 <br />#9 Wilson-Naneum Cherry 20 <br />KITTITAS COUNTY FLOOD CONTROL ZONE <br />2021-2026 <br />SIX YEAR CAPITAL IMPROVEMENT PLAN <br />REPETITIVE LOSS PROGRAM <br />FLOODPLAINS BY DESIGN-ACQUISITION <br />Acquisition of 413 acres of continuous Yakima Rive floodplain, to facilitate implementation of future flood risk reduction <br />projects and prevent development and associated risk within 200 flood hazard acres. Note that $3 M in grant funding for this <br />activity is expected to be expended in 2019 and is not captured in this work plan <br />RINGER LOOP PROPERTY IMPROVEMENTS <br />Control for invasive species, riparian buffer plantings, and building decomissioning at County-owned properties <br />HANSON PITS RESTORATION PLAN AND DESIGN <br />Technical investigation of potential risks associated with the Hanson Pits and the downstream private berm, and implications <br />for modifications to these structures, habitat restoration goals, and private property and transportation facilities. Selection of <br />HANSON PITS RESTORATION IMPL <br />Implementation of preferred alternantive from Hanson Pits Restoration Plan and Design . 2023 SRFB design only grant. <br />REECER CREEK DOLARWAY TO UNIVERSITY <br />Flood Control Zone District Cost share in support of City of Ellensburg Project to purchase property, construct setback levees <br />and construct second bridge along Dolarway Rd. Funding is anticipated to be expended in 2020, but some may be expended <br />in 2021. <br />STREAM GAGING AND EARLY WARNING SYSTEM <br />Installation and annual maintenance costs of real time stream gage network at 5 locations: Combined Wilson-Naneum <br />Creeks, Whiskey, Mercer, Wilson and Naneum Creeks, located downstream of respective splits. Survey and QA/QC support <br />for Teanaway River Gage. <br />CTP FLOOD STUDIES <br />Continued funding through FEMA's Cooperating Technical Partnership (CTP) program to improve flood models <br />and channel migration zone mapping. Costs in 2021 are for the Crystal Creek CTP match, with FEMA funds <br />projected to be expended in 2020. 2022: Coleman, Caribou, Cherry ; 2023: Yakima River (Elk Meadows); 2025: <br />Teanaway River CMZ <br />East Branch Wilson Re-Route <br />Conceptual Design and grant development