Laserfiche WebLink
�EAy[AT1ES. 70�,f h�, <br />rf <br />`P <br />ITitTwS Mt`sTT +-�-- <br />.;acobs <br />3. Evaluate potential sites described here and/or other properties as needed for advance <br />mitigation site suitability. Assess the preferred location to establish baseline and site <br />potential (by September 2021); <br />4. Submit an Advance Mitigation Plan to Corps and Ecology, complete with details of <br />size/acreage and type of mitigation proposed to be established, restored, rehabilitated, <br />enhanced, and preserved (by January 2022); <br />S. Site construction (Summer 2022), and; <br />b. Submit Advance Mitigation Site Use Plan defining ratios and credit used at year one to <br />mitigate for programmed CIP project impacts (by Fall 2023). <br />December 8, 2020 <br />