Laserfiche WebLink
<br />Contract Change <br /> <br />Bainbridge Island Office: 350 Madison Avenue North, Bainbridge Island, WA 98110 (206) 780-9370 <br />Bellingham Office: 907 Harris Avenue, Suite 301, Bellingham, WA 98225 (360) 746-8964 <br />Bend Office: 1725 SW Chandler, Suite 102, Bend, OR 97702 (971) 865-5896 <br />Seattle Office: 401 Second Avenue S, Suite 201, Seattle, WA 98104 (206) 328-7443 <br />Portland Office: 522 SW Fifth Avenue, Suite 301, Portland, OR 97204 (971) 865-5890 <br />Wenatchee Office: 23 South Mission Avenue, Suite C , Wenatchee, WA 98801 (509) 888-5766 <br />Yakima Office: 123 East Yakima Avenue, Suite 200, Yakima, WA 98901 (509) 895-5957 <br />www.aspectconsulting.com <br />Contract No.: 24 (revised) Project No. : 150338 Date: November 23, 2020 <br />Client: Kittitas County <br />Project Name: Consumptive Use Pilot Study <br /> <br />Description of Work Cost <br />Aspect Consulting, LLC (Aspect) is assisting Kittitas County and Granite <br />Creek Ranches LLC on their partnership on a pilot study to quantitatively <br />determine the percent of consumptive use associated with indoor-only <br />domestic use. The results of the study will be used to determine the <br />efficacy of alternative mitigation strategies in subbasins currently without <br />suitable mitigation options (e.g., yellow and red zones) and could greatly <br />expand the value of both parties existing water right portfolio, if <br />successful. Aspect is currently providing oversight during design, <br />implementation, and reporting of the study results. Contract Change No. <br />16 identified the scope of work, deliverables, and budget ($16,500) <br />required for this project. Contract Change No. 20 was executed to increase <br />the proposed budget by $4,500. However, the cost increase authorized by <br />Contract Change No. 20 will not be adequate to complete the scope of <br />work. Contract Change No. 24 therefore replaces Contract Change No. 20 <br />and increases $12,000 to the original budget amount of $16,500, <br />authorizing a total cost of $28,500 for the Consumptive Use Pilot Study. <br />This contract change also establishes a period of performance for the <br />scope of work identified in Contract Change No.16. <br /> <br />Completion Date: December 31, 2022 <br />Project Schedule <br />• Pilot Study Methodology Technical Memorandum Due 3/31/2021 <br />• Implementation and Monitoring: Spring 2021 (upon completion of <br />septic installation by Granite Creek Ranches LLC) through <br />10/31/2022. <br />• Final Report Due: 12/31/2022 <br /> <br />Budget increase justification: Two issues have arisen that have resulted <br />in changed conditions relative to our existing contract. First, Ecology <br />requested additional technical information and stakeholder coordination <br />beyond that anticipated. This has resulted in extensive coordination <br />including a meeting with Yakama Nation, USBR, and WDFW staff, and <br />additional technical coordination with Ecology in response to a list of <br />questions posed. Aspect met with Ecology management on June 21, 2018 <br />Given the uncertainty in the <br />development of this project <br />and that formal Ecology and <br />WTWG concurrence will be <br />necessary, Aspect proposes <br />to complete this work on a <br />time-and-materials basis, <br />not-to-exceed: <br /> <br /> <br /> <br />$12,0 00 <br /> <br /> <br /> <br /> <br /> <br />