My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement
>
Meetings
>
2020
>
11. November
>
2020-11-17 10:00 AM - Commissioners' Agenda
>
Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 2:11:47 PM
Creation date
11/18/2020 2:11:31 PM
Metadata
Fields
Template:
Meeting
Date
11/17/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
b
Item
Request to Approve an Agreement with Dude Solutions for Facility Preventive Maintenance Software and Support
Order
2
Placement
Consent Agenda
Row ID
69003
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g Dude <br />Solutions <br />:.:;:)l:i:-rJ::]j,,:;,li':r:,':..:.,',;:t:r1,,t1 :.r11.;:.,.;:. l-i;,,,,,, <br />By partnering with Dude Solutions you not only gain the engineering expertise of DSI's Service Providers; you <br />also are provided with assurance thatthe data collected as a result of the facilitycondition assessment is <br />properly integrated into your Dude Solutions software applications. Dude Solutions has successfully completed <br />more than 800 projects ranging from Facility Condition Assessments, Asset lnventory Collection (including <br />barcoding) and preventive maintenance schedule creation. Our methodology provides you with confidence to <br />make better data, decision-making on both short-term and long-term capital investment needs of your <br />organization. <br />Deliverables <br />All FCA's will include a deliverable contalning the following items <br />Narrative report with descriptions of major systems and corresponding conditions <br />Primary digital photos of key components and deficiencies are included in the narrative <br />2}-year capital Reserve table with System/Sub-System replacement costs and dates <br />lmport of Systems-level detail into client's DSI capital forecasting solution <br />lmport major Equipment ltems into client's Dude Solutions work & asset management solution <br />Methodology and Approach <br />A Certified Dude Solutions Service Provider (DSl Service Provider) will collect, document, and analyze <br />the facilities assessment data to achieve the following: <br />At the start of each building or facility assessment we will interview client's staff to understand what <br />improvements have been made in the last three years, what improvements are planned in the next <br />three years and known problems that may exist. <br />lnventory all major building equipment including quantity, size, asset tag number, manufacturer, model <br />and serial number. <br />ldentify deficient conditions in terms of deferred maintenance and building condition. <br />Provide a reasonable cost analysis for the above-mentioned efforts. <br />For single building projects, provide a report for the property that details the assessment data. <br />For multi-building projects, data will be collected from every building in the portfolio. The narrative <br />report will include an executive role up for all sites included with the service. <br />The field data collection will be performed at an individual and system level as described below: <br />1. Detailed data collection of individual equipment items will be captured to build an equipment inventory <br />which will be imported into DSI's work & asset management solution as defined in the Asset lnventory <br />and System/Component table below, <br />'l <br />j <br />6 <br />11000 Regency Pkwy ffi1} t Cary, NC 27518
The URL can be used to link to this page
Your browser does not support the video tag.