My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CH2M Amendment
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
CH2M Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 1:56:48 PM
Creation date
11/13/2020 1:56:43 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve an Amendment to the CH2M Hill Engineering (Jacobs) Professional Service Agreement
Order
4
Placement
Consent Agenda
Row ID
68283
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas Gounty Transfer Station Relocation Project - Phase 7 - Scope <br />of Work <br />This Phase 7 scope of work (SOW) encompasses additionaleffort provided by CH2M Hill Engineers, lnc. <br />(Jacobs) to support of Kittitas County (County) whh the completion of a FEMA Building Resilience in <br />Communities (BRIC) Grant Sub-Application. <br />Jacobs wrote a Pre-Application for FEMA Hazard Mitigation Assistance, which was submitted by the <br />County to the Washington Emergency Management Division (EMD) on September3,202O. The Pre- <br />Application was accepted by FEMA; triggering a Sub-Application that is due November 15, 2020. <br />Following is the scope and level of effort to complete Phase 7. This work will be performed in <br />accordance with the Professional Servlce Agreement and its Amendment No. 1-6. <br />Phase 7 <br />Phase 7 project duration is expected to continue for 1 mdnth (October 9 through November L5,2020r, <br />overlapping with the ongoing efforts of Phase 6. lf the Sub-Application is accepted, additionaleffort is <br />foreseen for any required additionalsubmissions and is not defined in this Amendment. <br />Task l: Project Management <br />The full BRIC Sub-Application will require regular communication with the County and EMD to prepare <br />an accurate and compelling application. The following effort for Phase 7 includes: <br />r Communication caUmeeting agendas and high-levelsummaries (up to 5) <br />r Correspondence and meetings wlth EMD staff and high-level summaries (up to 3) <br />r One progress report and one invoice after completion of grant Sub-Application <br />Task 2: FEIvIABRIC Grant Sub-Application <br />The fullsub-Application, required attachments, and benefit cost analysis (BCA) will be submitted online <br />in the FEMA Grants Outcomes (FEMA Go) platform by November L5,2O2Ofor initialState revlew.The <br />County will registerJacobs as a Subrecipient Authorized Representative {SAR)'to facilitate Jacobs <br />submitting the 5ub-Application. lnstructions on how to register and create an account in FEMA G0 and <br />the System for Award Management (SAM.gov) is found here: <br />https://www.fema.eov/sites/default/files/2020-07fema-eo user-reeistration-loein reference-.' <br />euide.pdf lnformation required for this registration includes organization's legal name, mailing and <br />physical address, ElN, DUNS and DUNS +4 numbers, and the Electronic Business Point of Contact <br />(eBlZPoC). <br />Task 2.1 FEMA GO Sub-Application & Attaohments <br />The FEMA Go Sub-Application template will be populated by Jacobs and later uploaded by Jacobs into <br />FEMA GO. The sections of the 5ub-Application that will require substantial narrative include: <br />r Contact lnformation . Location - Project Benefiting Area, <br />. Scope of Work Project Site lnventory <br />r Budget <br />r Cost-Effectiveness (see Task 2.3) <br />r EnvironmentaUHistoricPreservation <br />Review <br />r Community Rating System (CRS) <br />r CooperatingTechnical Partner(CTP) <br />r Bullding Code Effectiveness Grading <br />Schedule (BCEGS)
The URL can be used to link to this page
Your browser does not support the video tag.