My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-185
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Res-2020-185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 11:53:14 AM
Creation date
11/5/2020 11:52:31 AM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II'PG <br />TASK 5 - ENVIRONMENTAL <br />Objective: Prepare and submit environmental analysis and permitting for project approval <br />underfederal, state, and local laws and regulations. Environmental permitting includes NEPA and <br />SEPA processes and assumes that each will receive a categorical exclusion. <br />Consultant Responsibilities: <br />1. Prepare Draft NEPA Environmental Classification Summary (ECS) and SEPA Checklist based <br />upon project specifications and existing technical studies. These will identify potential <br />environmental impacts and any mitigation measures necessary to reduce project impacts <br />to less-tha n-significant levels. <br />2, Prepare Final NEPA ECS and SEPA Checklist. Revise drafts based on review and input from <br />County, WSDOT and other State agencies, as required and submit final drafts. <br />Assumptions: <br />L. Project will receive a NEPA Categorical Exclusion <br />2. Project will receive a SEPA Categorical Exclusion <br />3. Completion of the NEPA/SEPA will meet requirements of local laws and regulations and no <br />additional local permitting is required. <br />4. Project does not result in an increase of impervious surface <br />5. Project does not require or include right of way acquisition <br />6. Project does not result in change to existing traffic volumes or patterns <br />7. Project does not result in substantial changes in noise levels (except temporary construction <br />noise) <br />8. Project does not result in changes to land use. <br />9. Project does not result in changes to air and water quality <br />10. Project does not include non-exempt demolition activities <br />11. No previous land use with potential for hazardous materials and no anticipated disturbance <br />of hazardous materials. <br />12. Project does not fall within the 100-year floodplain <br />13. Project is not within 300 feet of a water body, wetlands, environmentally sensitive area, <br />listed endangered or threatened species or critical habitat. <br />1.4. Project does not include use of properties protected by Section (fl of the Department of <br />Transportation Act (49 U.S.C. 303) <br />1,5. No effort beyond that provided for in Task 3 Cultural Resources Assessment is required in <br />relation to cultural and historic resource management. <br />Countv Responsibilities: <br />L. N/A <br />Page l8 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P:509.663.2711 www.kpg.com
The URL can be used to link to this page
Your browser does not support the video tag.