My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2020-185
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Res-2020-185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2020 11:53:14 AM
Creation date
11/5/2020 11:52:31 AM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II,PGi <br />TASK 48 - 30% PRELTMTNARY DESTGN (GUARDRATL REPLACEMENT AND UPGRADE) <br />Objectivei Develop 30% design for Vantage Highway guardrail replacement and upgrade <br />consisting of plans and construction cost estimate. <br />Consultant Responsibilities: <br />L. Participate in design coordination meetings with the County. Prepare agendas, figures, <br />meeting minutes and other exhibits as necessary. Assumes up to two coordination <br />meetings. Coordination meetings for Task 4A and 48 will be at the same meeting. <br />2. Prepare 30% Review Submittal for review and approval by the County. The submittal will <br />include, at a minimum, the following: <br />a. Plans <br />i. Survey Basemap - Develop from County provided lidar survey for use in <br />design development. This effort is common between Tasks 44 and 48 and <br />one basemap will be developed for the project. <br />ii. Guardrail Plans and Details <br />b. Construction Cost Estimate <br />Assumptions: <br />L. County provided Lidar survey is complete and adequate for the guardrail project design <br />and does not require correction to vertical datum values. <br />Countv Responsibilities: <br />L. Provide Lidar survey of project. <br />2. Provide review of 3oo/o design. <br />Deliverables: <br />1-. 30% Review Submittal: Plans and Construction Cost Estimate <br />Page l7 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P:509.663.2711 www.kpg.com
The URL can be used to link to this page
Your browser does not support the video tag.