Laserfiche WebLink
A summary of the anticipated project elements are as follows. <br />o Geotechnicalinvestigation <br />o Cultural Resources Assessment <br />o NEPA Categorical Exclusion (CE) in coordination with WSDOT <br />o Traffic control <br />o Erosion control <br />o Pavement and overlay design <br />o Guardrail design <br />o Site restoration <br />The specific scope of work for these improvements is described in the following tasks. <br />ICPG <br />Page l2 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P:509.663.2711 www.kpg.com