My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task <br />No. <br />Task Description <br />Total Hours and Labor <br />Fee Estimate by Task <br />Engine Senior <br />i g Praleq <br />Man <br />En m 9 <br />Project CAD Offfes <br />i 1 <br />Engineer Tachnican Asslatant <br />I 226M $ 16400 <br />S 140.00 S 10$.00 5 74.00 <br />Hours Fee <br />Task 5 - Environmental <br />6,1 <br />Pre oration or ]reP. NEPA CE and SEPA C;1erJGa1 Documentation <br />B <br />5a <br />4 <br />tib <br />9,449.00 <br />52 <br />Review Coordination with WSDOT <br />1 4 <br />8 <br />1 32 <br />1 <br />$ SAWN <br />5.3 lPreipawton <br />of Final NEPA CE SEPA Checklist Docamentallon <br />1 <br />8 <br />1 32 <br />1 <br />4 <br />1 44 <br />1 $ 6,088.00 <br />YeakTotall <br />4 1 <br />24 <br />1 120 <br />1 0 1 <br />8 <br />1 456 <br />$ 22,232,00 <br />Task BA - Final Design (Pavement Repair and Overlay) <br />BA1 <br />CoordirsiWon and Meelin a with Cou ..y (Up to 2 Meet!n s <br />8 <br />8 <br />B <br />2 <br />26 <br />$ 3464,00 <br />6A2 <br />Ut'I. CaaMIRaCon <br />4 <br />8 <br />1 4 <br />2 <br />18 <br />S 2336.00 <br />645— <br />8D% Plans, spacltlaffiom, and t mate <br />7Vplcal SeMons <br />4 <br />8 <br />12 <br />it 1.384.00, <br />Paving Plane and Details <br />24 <br />24 <br />49 <br />S E.832.00 <br />S46 PreAsatoration Plana and Misc. Details 1 <br />8 <br />24 <br />32 <br />$ 3 592.00 <br />ConsWdfon 7ra9c Conhol Plansi <br />B <br />is <br />i;F- <br />2,768.00 <br />Quantity Takeoffs and Cost Estimate) <br />4 <br />8 <br />12 <br />-1, 776.90 <br />S edtkaton Padra e2 <br />4 <br />20 <br />28 <br />$ 3 90a,o <br />QAIQC Revlew <br />2 <br />2 <br />2 <br />2 <br />8$ <br />1 285.00 <br />SuModrl <br />4 <br />19 <br />74 <br />94 <br />0 <br />J. <br />$ 26 28.00 <br />sp,4 <br />Pre -Old Plans, Specifications. a Estlmate <br />Inco orate 90% Review Coramertts and Produce 100% Plans and Spece <br />4 <br />24 <br />40 <br />69 <br />8,362.00 <br />Qmrk'& Takeaft and Cast Estimate <br />6 <br />B <br />$ 1,120.00 <br />QAlQC R-Wwi <br />2 <br />2 <br />2 <br />2 <br />8 <br />$ 1,286.00 <br />WSDOT Bid Document Appml Co"nallioni <br />1 <br />8 <br />20 <br />1 6 <br />34 <br />4730.00 <br />sultift"ll <br />] 1 <br />14 <br />94 <br />A <br />0 <br />119 <br />$ 15 78.00 <br />80.5 1131d <br />Document Plans, Speclifleations, and Estimate <br />Incorporate P.% -Bid Re+iew CommeNs antlProtluee Bid Document Pians end S eco: <br />4 <br />18 <br />30 <br />50 <br />$ 5986.06 <br />qua. Takeoffs end Cori Eriima!e <br />B <br />8 <br />; 120.00 <br />QAfQC 9WAFWI <br />2 <br />2 <br />2 <br />a <br />1,255.00 <br />autMMal <br />2 <br />6 <br />26 <br />32 <br />0 1 <br />so <br />$ S 72A0 <br />Task Total <br />9 <br />42 <br />470 <br />166 <br />4 <br />311 <br />$ 50,118.00 <br />Task BB - Final Design (Guardrail Replacement and Upgrade) <br />6B <br />Coordination and Meetings With CauMy CJpto 2 Mee0n s <br />B 1 <br />8 <br />8 <br />2 1 <br />26 <br />S 3,404.00 <br />8B.2 <br />Ullitiecoardinatlan <br />4 1 <br />9 <br />1 4 12 <br />18 <br />336,00 <br />611.3 <br />99% Plane, 8 eclrlcaUgna, and Eaffimale <br />Typical Sadions <br />4 <br />8 <br />12 <br />$ 1,394.00 <br />Guardrel Plans and Details <br />4B <br />32 <br />a0 <br />i $ 10 016.00 <br />Site Pre JRestandlon Plans and Mise. Deta0s! <br />8 <br />24 <br />32 <br />3 592.00 <br />Constmucdon Traft Control Plans <br />a <br />24 <br />32 <br />$ 3.692,o0 <br />Qmntity Takeaft end Coat Estimate 1 <br />4 <br />B <br />12 <br />$ 1,770.00 <br />6 ec[fieWon Packagel Package <br />2 i <br />4 <br />20 <br />E. <br />26 <br />1 $ 3.908.0D <br />QMQC Review] <br />2 <br />2 <br />2 <br />2 <br />11 <br />f 266.00 <br />8uatofal <br />4 <br />1Q <br />98 <br />so <br />202 <br />S 26 4,00 <br />2 e13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.