My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />PRIME CONSULTANT COST COMPUTATIONS <br />Cllarrt Icttitaa County <br />Project Vantage Highway Pavemert and Guardrail Replacement (MP 21.25 fo MP 27.51) <br />KPG PROJECT NUMBER: 20047 <br />nATE- O&Md— 29. 282D <br />Task <br />No. <br />Task Dssen <br />Total Hours and Labcw <br />Fee Estimate by Task <br />Mena9ption Engiae r rg <br />&etdar <br />Prolem <br />Enainear <br />Engineer Prgea <br />CAD Techrnwn Aaretassmant <br />i <br />1 1""0 <br />; 14I1I00 <br />; 1aSf AA : YA.9a <br />ttaffts FOa <br />Task 1 - Project Management <br />1.1 Contract Admi FM. mor Inwicitia, and Pro rasa Reports <br />4 1 <br />1fi I16 <br />1 39 <br />1 S <br />4,712.00 <br />1.2 Project Coordination Budge, and Schedule Management <br />20 <br />1 20 <br />S <br />9 80,00 <br />1.3 Subwnsuftent Mans mann and CoordIrAt:or. <br />20 <br />20 <br />3 811.00 <br />1 A Fandina AgencySJbrhM* and Coordination <br />20 <br />20 <br />S <br />3,280.00 <br />1.5 UDBE Daocmenbdion <br />20 <br />ifi <br />1 35 <br />14 <br />4464.00 <br />TaskTofil <br />4 <br />$11 <br />0 <br />0 <br />32 <br />fat <br />5 <br />19,018.00 <br />Task 2 - Geotechnical Design (Pavement Coring Field Work and Report - UDBE Subconsultant) <br />2.' Pavement Corkin Field Work and Report - see subconsukam HNA Geosrfences <br />Task Total <br />; <br />Task 3 - Cultural Resources Assessment (Subconsultent) <br />3.1 lCuPLaal Resources Field Work and Report - sae subconsuBant Plateau Archeological <br />S <br />Task Tota{ <br />; <br />Task 4A - 30% Preliminary Design (Pavement Repair and Overlay) <br />4P.1 Prepare HIgh Leval Cost Evalua:lon ar Faftq AOernattves i <br />4 1 <br />18 1 <br />40 1 <br />40 1 <br />100 <br />S <br />13 8,00 <br />4A2 Coordination and Meaan s with Cou to 2 Meefincisj <br />I <br />8 I <br />8 <br />8 1 <br />1 <br />26 <br />3,330.00 <br />40.3 30% Pians a11a Estimate <br />BL(nw Bess <br />6 <br />12 <br />20 <br />3 <br />2355.00 <br />Typ(wl Sedlons <br />9 <br />B <br />is <br />$ <br />1844.00 <br />Paying Plans and Dalalls <br />32 <br />40 <br />72 <br />$ <br />960. <br />BOo <br />Qua.Quafty Twaaft and Cost EAnnafe <br />2 <br />16 <br />4 <br />22 <br />2.980.00 <br />QAIQC Review <br />2 <br />2 <br />2 <br />2 <br />6 <br />E <br />1,286.00 <br />Subtotal <br />2 <br />4 <br />Be <br />ra <br />0 <br />138 <br />$ <br />17146.80 <br />Task Total <br />6 <br />28 <br />114 <br />114 <br />1 <br />263 <br />$ <br />33,724.00 <br />Task 46 - 30% Preliminary, Design (Guardrail Replacement and Upgrade} <br />4B.1 Coordination and Mean swilh Cou to 2 MeeOn e <br />B <br />8 <br />B <br />25 <br />3,330.00 <br />46.2 30% P - rrsand Esamats <br />Sunjay Saaeme <br />I <br />8 <br />12 <br />20 <br />IS <br />2,356.00 <br />T ical Sections <br />8 <br />B <br />18 <br />1 H44.00 <br />Ouardrall Plans and DetaBs <br />56 <br />40 <br />9H <br />S <br />t 1 x50.00 <br />Qv Takeoffs and Cost Estimate <br />2 <br />16 <br />4 <br />22 <br />S <br />2 960.00 <br />QAIQC Review <br />2 <br />2 <br />2 <br />2 <br />8 <br />1,266.00 <br />Suhamsr <br />2 <br />4 <br />99 <br />66 <br />0 <br />162 <br />$ <br />20,306.00 <br />Task Total <br />2 <br />12 <br />90 <br />74 <br />1 <br />187 <br />; <br />15,836.00 <br />1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.