Laserfiche WebLink
2. Provide comments and guidance to KPG for each design deliverable which will form the <br />basis for development of each subsequent submittal. <br />Deliverables: <br />1. 90% Review Submittal: Plans, Specifications and Construction Cost Estimate <br />2. Pre -Bid Review Submittal: Plans, Specifications and Construction Cost Estimate <br />3. Bid Document Submittal: Plans, Specifications and Construction Cost Estimate <br />Page 115 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.ki2g.com <br />