My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG_KPG_VantageHwy
>
Meetings
>
2020
>
11. November
>
2020-11-03 10:00 AM - Commissioners' Agenda
>
Resolution_LAG_KPG_VantageHwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:54:48 PM
Creation date
10/29/2020 1:52:54 PM
Metadata
Fields
Template:
Meeting
Date
11/3/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution to Award a Local Agency Agreement to KPF, P.S.for the Design and Environmental Permitting for the Pavement and Guardrail Replacement on Vantage Highway MP 21.25 - MP 27.51; CRP 298-19
Order
20
Placement
Consent Agenda
Row ID
68283
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M]POW <br />TASK 2 — GEOTECHNICAL DESIGN <br />Objective: Perform a geotechnical investigation for the project, provide engineering analysis and <br />recommendations for pavement overlay design and document in a geotechnical report. <br />Consultant Responsibilities: <br />I. Mark proposed coring locations. <br />2. Perform "One Call" state utility notification to locate underground utilities. Adjust boring <br />locations as needed. <br />3. Prepare Right of Way use application and submit to Kittitas County. <br />4. Prepare traffic control plan and submit to Kittitas County. <br />5. Perform visual assessment of pavement condition. <br />6. Perform 20 pavement cores and shallow subsurface excavations using hand tools to assess <br />pavement layer thicknesses and subgrade support conditions. Pavement cores will be <br />backfilled with compacted gravel and patched with Aquaphalt cold patch. <br />7. Prepare photographic logs of pavement cores and assign laboratory testing on selected <br />samples. <br />8. Perform engineering analyses for pavement overlay design. <br />9. Prepare a draft geotechnical report presenting the results of our explorations and <br />engineering recommendations. <br />10. Prepare final geotechnical report. <br />Assumptions: <br />1. The subject matter of the report will be limited to the project overlay. <br />2. Temporary traffic control for coring can be provided using flaggers. <br />County Responsibilities: <br />1. N/A <br />Deliverables: <br />1. Draft and Final Geotechnical report for the Vantage Highway Pavement and Guardrail <br />Replacement project. <br />Page 14 <br />23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www,kpa.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.