Laserfiche WebLink
NJGantt ChartL Start wayfinding processa Conduct wayfinding retreat2 Create alternative conceptsa Create alternative conceptsb Review concepts with publicc Refine preferred conceptd Validate final designs/costs,/methods3 Develop style guides, specificationsa Develop style guides/specifications/costsb Review guides/costs/schedulesc Refine guides,/costs/methods/fundingd Approve implementation!l Milestone meetings, workshops, and eventsTeam Leader/Planner - Tom Beckwith FAICPo4024208$ 7,000$4,200$3,s00$ 1,400$0$250$0$2 s0$7,000$4,4s0$ 3, s00$ 1,650IT28248$ 19,600$ 1,400$4,200$ 1,400$ 19,600$ 1,6s0$4,200$ 1,650$45,3s0s2,268I Graphic Design - Michael Arthur| | Landscape Design - Jennifer Kiusalaas ASLA LEEDI I I GIS - Jennifer Hackettttltllllweeks I I i I prof laborI I I I 2 4 6 8 O 2 4 6hours costxx q 8 $r,4ooXXXXXXXXXXX72020totalcost$ 1,6s0materialcost$2s0$0$2s0$0$250$ r,250$0$2,400$900$4,5 50XXXXXXXXXXXXPublic Works sign fabrication option1-3 Start, create, develop style guides,/specifications4 Implement wayfinding by public contracta Develop bid documents/review bids X Xb Fabricate river directory by vendor - each Xb Fabricate wayfinding sign by vendor - each XSubtotal 252 $44,100Contingency S%Project budget$47,618252 S44,tO0 $1,250 $47,618Subtotal$4,200$48,300$4,200$26,400$90,900$169,11824111012765%CoVendor bid sign fabrication option3a Assumes specifications for 101 single-sided wayfinding and 11 double-sided river directory signsDoes not include mounting hardware, posts, or installation.$8456L77,573