Laserfiche WebLink
Easton Ridge Land Company, Inc. December 2019 <br />Update to Development Agreement <br />Marian Meadows <br />2. EWD currently indicates it has the capacity to service this plat and has provide a Letter of Water <br />Availability to ERLC. While these are time sensitive, the District has acknowledged its legally <br />responsibility to provide water for Marian Meadows. <br />3. The State question the name of the system. While the State indicates the District is known as <br />Easton Water District, all of our resolution and agreements to date have been in the name of <br />Kittitas County Water District #3. As asked in prior correspondence, please advise as to the name <br />we should refer too. <br />4. The connections requested have been outlined within a prior submittal to the record. This was <br />formulated with input and guidance from the District's Engineer. Each residential dwelling is <br />assigned 1 ERU. As no historical basis could be determined for water usage similar to what has <br />been proposed and approved for the RV Complex, we used septic effluent discharge <br />documentation to assist in determining water needs for this use. It is our conclusion that the 23.92 <br />ERU's identified for other uses within our assessment is conservative and will cover the uses of <br />the RV storage, shop and retail areas. <br />5. All documentation and discussion with the District have indicated that the District has <br />sufficient water connections to satisfy the needs of Marian Meadows at this time. The <br />documentation and preliminary plat engineering are clear that the approved PUD will include 77 <br />single family dwelling, 12 townhomes and the RV Complex uses. We are confident that the 120 <br />ERU's identified will satisfy the needs of this community. <br />As negotiation with the District proceed, designs to District infrastructure are engineered and <br />approved, the Developers Extension Agreement will be formulated. It is our understanding that <br />this process includes the District submitting to the State all documentation, engineering and <br />planning for system improvements. This will come from the District and not be provided by <br />ERLC. <br />