My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Easton Ridge Land Company, Inc. December 2019 <br />Update to Development Agreement <br />Marian Meadows <br />2. EWD currently indicates it has the capacity to service this plat and has provide a Letter of Water <br />Availability to ERLC. While these are time sensitive, the District has acknowledged its legally <br />responsibility to provide water for Marian Meadows. <br />3. The State question the name of the system. While the State indicates the District is known as <br />Easton Water District, all of our resolution and agreements to date have been in the name of <br />Kittitas County Water District #3. As asked in prior correspondence, please advise as to the name <br />we should refer too. <br />4. The connections requested have been outlined within a prior submittal to the record. This was <br />formulated with input and guidance from the District's Engineer. Each residential dwelling is <br />assigned 1 ERU. As no historical basis could be determined for water usage similar to what has <br />been proposed and approved for the RV Complex, we used septic effluent discharge <br />documentation to assist in determining water needs for this use. It is our conclusion that the 23.92 <br />ERU's identified for other uses within our assessment is conservative and will cover the uses of <br />the RV storage, shop and retail areas. <br />5. All documentation and discussion with the District have indicated that the District has <br />sufficient water connections to satisfy the needs of Marian Meadows at this time. The <br />documentation and preliminary plat engineering are clear that the approved PUD will include 77 <br />single family dwelling, 12 townhomes and the RV Complex uses. We are confident that the 120 <br />ERU's identified will satisfy the needs of this community. <br />As negotiation with the District proceed, designs to District infrastructure are engineered and <br />approved, the Developers Extension Agreement will be formulated. It is our understanding that <br />this process includes the District submitting to the State all documentation, engineering and <br />planning for system improvements. This will come from the District and not be provided by <br />ERLC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.