Laserfiche WebLink
Easton Ridge Land Company, Inc. December 2019 <br />Update to Development Agreement <br />Marian Meadows <br />Response to Russell Mau, Washington State Dept. of Health <br />Easton Ridge Land Company (ERLC) has been involved and working with Easton Water District (EWD) <br />for upward of 15 years. We have included the Water District's Resolution #0307796-2 dated March 9, <br />2004, for reference, which outlines the following: <br />-Has facilitated the transfer of northern Pacific Railroad Water Right to District, <br />-Has assisted in changing points of withdrawal for two District Water Rights, <br />-Has assisted in changing "area of use" for District water Rights to include Marion <br />Meadows property and annexed into District, <br />-Has facilitated updates of District water systems Comprehensive Plan. <br />-Has completed 700 if of looped mainline extension with fire hydrant down Kittitas <br />County ROW known as Meadow Way, <br />-Developer has contributed $43,000 for efforts with District water rights/Comp Plan, <br />-Design and construction of new water storage (100,000 gals) <br />As shown above, ERLC has provided a 700' extension of the systems infrastructure into the <br />Development. <br />Subsequent to the agreement and work, three significant issues regarding the Plat of Marian Meadows <br />took place: <br />• Kittitas County required an Environmental Impact Statement be prepared, <br />• The economy transition into the 2008 National Recession, and <br />• The principle ownership of ERLC underwent significant changes. <br />Effort to revive the plat were again start in 2016 with approvals for the PUD received in May of 2018. <br />During this period questions have been asked by both the County and State which literally could not be <br />answered until approvals were in place. With approvals, we have begun discussion with Easton Water <br />District on design requirement, tank placement, engineering and District infrastructure needs. The District <br />is a small municipal system with primarily volunteer management and oversight so decision and answers <br />require time. <br />Over the past 18 months, a representative of ERLC has attended many monthly meetings. Design and <br />engineering work have commenced for both the Plat of Marian Meadows and District infrastructure <br />needs. It should be noted that the needs of the District are different from those addressed in the earlier <br />Resolution with a larger storage tank in the equation. <br />To address specific points made by Mr. Mau with Washington State's Department of Health; <br />1. Marian Meadows has annexed into the Districts "water- service area" and been provided with the <br />Districts intention of servicing this plat. We are moving forward with this direction and will <br />continue to work with the District until advised otherwise. Please note that the Applicant has the <br />ability and resources to provide a Group A Water System for this plat if needed. <br />