My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The fire prevention plan submitted as part of Exhibit C is still under review by the <br />Kittitas County Fire Marshal and Building Official. Further comments will be provided <br />as they become available or with the second round of Staff review, whichever occurs <br />first. At this time, the fire prevention plan should be updated to reflect that the four large <br />single-family lots on the eastern slope are part of the project area and are subject to the <br />fire prevention plan. <br />• The Community Standards and Guidelines document provided as Exhibit D is still under <br />review by the Kittitas County Building Official. Further comments will be provided as <br />they become available or with the second round of Staff review, whichever occurs first. <br />At this time, this exhibit should be updated to reflect that the Commercial Forest Setback <br />of 200 feet from property lines abutting lands zoned Commercial Forest shall be adhered <br />to pursuant to KCC 17.57. The northern and eastern boundaries of the Marian Meadows <br />PUD currently abut lands zoned Commercial Forest. <br />• Exhibit F of the draft Development Agreement discusses the conditions of Ordinance <br />2018-006 that are either required to be addressed by the agreement or the applicant is <br />choosing to address through the agreement. <br />o The applicant is requesting that Condition 40 of Ordinance 2018-006 be reviewed <br />by the BOCC due to the argument that this condition was added without input <br />from the applicant. This condition cannot be altered as the applicant did not file a <br />timely LUPA on Ordinance 2018-006 and the County does not have a process for <br />amending conditions of preliminary approvals. <br />o Conditions 41, 45, and 46 of Ordinance 2018-006 were not listed in Exhibit F <br />however they are required to be addressed by the Development Agreement. <br />Please update the draft Development Agreement and Exhibits as necessary to <br />reflect/address these conditions. <br />• A Technical Memorandum was provided by the applicant from Raedeke Associates, Inc. <br />regarding condition 4 of Ordinance 2018-006 which states "The non -fish stream mapped <br />at the southern portion of the site shall be reassessed during high spring flows to <br />determine necessary setbacks under KCC 17A.07 to be incorporated into a stormwater <br />management plan". This memo states that the site visited three times: February 27, <br />March 13, and March 20, 2018 at which times the site was covered by snow. Based in <br />part on these site visits, Raedeke determined that the Type N Stream in question does not <br />actually exhibit the characteristic of a stream and that no evidence of evidence of flow <br />was observed. County staff agrees with the Washington State Department of Fish and <br />Wildlife comments that photos should have been included with this memorandum of each <br />site visit to verify what was observed on the ground. Further a site visit must occur <br />during spring high spring flows when snow is not on the ground to accurately assess the <br />Type N Stream in question. The Raedeke Technical Memorandum shall be updated <br />accordingly. Since it is necessary for this update to occur during spring high flows and <br />after snow has melted from the site, and condition 4 is not required to be met through the <br />development agreement, County staff will not require this to be updated for further <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.