My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dept. of Public Works <br />connections that are proposed for Marian Meadows can be served by the existing <br />system, or apply for a new Group A Community public water system with the DOH Office <br />of Drinking Water. <br />• Kittitas County Environmental Health requires that the applicant must provide written <br />documentation from the water purveyor indicating the water district commits the <br />appropriate number of connections for the entire project (made therefore unavailable to <br />any other lots) prior to final signoff. <br />2. In Exhibit F — Conditions, section 31.4.1 indicates that the Marian Meadows/Easton <br />Water district shall confirm an intended connection to the Easton Water District and then <br />submit estimate water usage quantities. The application is not clear about the estimated <br />water usage quantities, in part because 31.4.1 B ERU analysis is not included (Table 4 <br />from DOH 337-066 document is attached, with design flow rates for campgrounds, but <br />the included materials do not clearly identify the quantity of water needed for the RC park <br />and campground, not the RV retail and service. <br />3. Material provided should also be clear if the application covers the 33 residential units <br />proposed in the application, or the 89 residential units identified in Ordinance 2018-006). <br />Neither is there documentation demonstrating that the Easton Water district is able to <br />provide connection. The attached certificate of water availability expired. on 5/17/2018 <br />and the included Kittitas County Water District No 3 resolution, signed 3/9/2004 is also <br />expired. Documentation supporting the acceptance of the water purveyor for the projects, <br />phasing, and timelines identified in Exhibit E (looped water line and water tank) is <br />needed. <br />Survey: <br />_Required Corrections <br />Development Agreement Page 12 <br />1. Exhibit 'A' is a listing of Assessor Parcel Numbers, and is NOT a suitable alternative for a <br />legal description of lands. <br />Page 2 of 2 <br />205 West 5`h, Rm 108 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />G:\PLANNING1DevelopmenADevelopment AgreementlDV-19-00001 Marian Meadows\DV-19-00001 Public Works <br />Comments.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.