My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F - Conditions <br /> <br />Page 1 of 3 <br /> <br />Marian Meadows – Specific Condition within Approval <br /> <br />1.1 - Easton School District: Mitigation shall be provided for the impacts to facilities and <br /> transportation based on a total of 53 new students. (Determined using 79% (89 units <br /> rather than 113 units) of Alternatives 3D and 5, Tenure Scenario 1, page 3-135 of the <br /> FEIS.) <br /> See Exhibit B <br /> <br />1.2 Kittitas County Fire District #3: Mitigation shall be provided for the impacts to fire <br /> district facilites and equipment based on 89 dwelling units, RV storage, RV park, <br /> campground, or other approved commercial uses. <br /> See Exhibit C <br /> <br />4) The non-fish stream mapped at the southern portion of the site shall be reassessed during <br /> high spring flows to determine necessary setbacks under KCC 17A.07 to be incorporated <br /> into a storm water management plan. <br /> See Exhibit F - #4 Raedeke Stream Study <br />5) A fire management plan shall be prepared and implemented, with building covenants to <br /> ensure that homes are built with fire prevention measures consistent with County WUIC <br /> and in compliance with Easton Water District standards. <br /> See Exhibit C <br /> <br />13) The number of units associated with the campsites and RVs shall be identified in the <br /> development agreement and final PUD development plan in order to determine road <br /> standards. Based on the traffic impact analysis provided by the applicant, the roads <br /> serving the RV condos shall minimally be 22 feet paved with 60-foot right of way <br /> (private). The roads serving the RV campsites shall minimally be 20 feet wide gravel <br /> with 60 feet of right of way (private). <br /> See Exhibit D – Community Standards and Guidelines <br /> <br />18) Locations identified for snow storage shall be designed to accommodate storage for 84 <br /> inches of annual accumulation for the square footage of all roadways and parking areas. <br /> Snow storage areas accommodating public roadways shall be included in the public right <br /> of way dedication. <br /> Within this condition was comments pertaining to the “public” dedication of <br /> surface area for winter snow storage of snow accumulation of 84”. Within the plat <br /> design for Marian Meadows we have allow for a significant amount of land for this <br /> purpose that is located adjacent to the Public Roadway. This was not earmarked for <br /> public dedication and we question the County’s intention of assuming ownership and <br /> control for this use? We ask for clarification of this condition and inclusion within the <br /> Development Agreement?
The URL can be used to link to this page
Your browser does not support the video tag.